Average Load given Load Factor for Turbo-generators Solution

STEP 0: Pre-Calculation Summary
Formula Used
Average Load = Load Factor*Peak Load
LAvg = LF*PL
This formula uses 3 Variables
Variables Used
Average Load - (Measured in Watt) - Average Load is the average load occurring on the power station in a given period known as an average load.
Load Factor - Load Factor is the ratio of average load to the maximum demand during a given period.
Peak Load - (Measured in Watt) - Peak Load is the maximum load on an electrical power-supply system.
STEP 1: Convert Input(s) to Base Unit
Load Factor: 0.1 --> No Conversion Required
Peak Load: 4 Kilowatt --> 4000 Watt (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
LAvg = LF*PL --> 0.1*4000
Evaluating ... ...
LAvg = 400
STEP 3: Convert Result to Output's Unit
400 Watt --> No Conversion Required
FINAL ANSWER
400 Watt <-- Average Load
(Calculation completed in 00.004 seconds)

Credits

Created by M Naveen
National Institute of Technology (NIT), Warangal
M Naveen has created this Calculator and 500+ more calculators!
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

9 Water Power Engineering Calculators

Total Power that can be Developed given Utilization Factor
Go Total Power that can be Developed = Max Power Developed/Utilization Factor
Maximum Power Developed given Utilization Factor
Go Max Power Developed = Utilization Factor*Total Power that can be Developed
Utilization Factor
Go Utilization Factor = Max Power Developed/Total Power that can be Developed
Energy Actually Produced given Plant Factor
Go Energy Actually Produced = Plant Factor*Max Energy Produced
Maximum Energy Produced using Plant Factor
Go Max Energy Produced = Energy Actually Produced/Plant Factor
Plant Factor
Go Plant Factor = Energy Actually Produced/Max Energy Produced
Average Load given Load Factor for Turbo-generators
Go Average Load = Load Factor*Peak Load
Peak Load given Load Factor for Turbo-Generators
Go Peak Load = Average Load/Load Factor
Load Factor for Turbo-generators
Go Load Factor = Average Load/Peak Load

Average Load given Load Factor for Turbo-generators Formula

Average Load = Load Factor*Peak Load
LAvg = LF*PL

What is meant by Peak Load?

Peak load is a period of time when electrical power is needed a sustained period based on demand. Also known as peak demand.

How to Calculate Average Load given Load Factor for Turbo-generators?

Average Load given Load Factor for Turbo-generators calculator uses Average Load = Load Factor*Peak Load to calculate the Average Load, The Average Load given Load Factor for Turbo-generators Average Load is defined as the average power consumed by load in given period, usually, day. Average Load is denoted by LAvg symbol.

How to calculate Average Load given Load Factor for Turbo-generators using this online calculator? To use this online calculator for Average Load given Load Factor for Turbo-generators, enter Load Factor (LF) & Peak Load (PL) and hit the calculate button. Here is how the Average Load given Load Factor for Turbo-generators calculation can be explained with given input values -> 400 = 0.1*4000.

FAQ

What is Average Load given Load Factor for Turbo-generators?
The Average Load given Load Factor for Turbo-generators Average Load is defined as the average power consumed by load in given period, usually, day and is represented as LAvg = LF*PL or Average Load = Load Factor*Peak Load. Load Factor is the ratio of average load to the maximum demand during a given period & Peak Load is the maximum load on an electrical power-supply system.
How to calculate Average Load given Load Factor for Turbo-generators?
The Average Load given Load Factor for Turbo-generators Average Load is defined as the average power consumed by load in given period, usually, day is calculated using Average Load = Load Factor*Peak Load. To calculate Average Load given Load Factor for Turbo-generators, you need Load Factor (LF) & Peak Load (PL). With our tool, you need to enter the respective value for Load Factor & Peak Load and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.