Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression Solution

STEP 0: Pre-Calculation Summary
Formula Used
Density of Drilling Mud = (Lower Section of Drill String Length*Mass Density of Steel)/Length of Pipe Hanging in Well
ρm = (Lc*ρs)/L
This formula uses 4 Variables
Variables Used
Density of Drilling Mud - (Measured in Kilogram per Cubic Meter) - Density of Drilling Mud considering a steel drilling pipe hanging in an oil well.
Lower Section of Drill String Length - Lower Section of Drill String Length that is in Compression depends on the density of the drilling mud, length of pipe in well and mass density of steel.
Mass Density of Steel - (Measured in Kilogram per Cubic Meter) - Mass Density of Steel varies based on the alloying constituents but usually ranges between 7,750 and 8,050 kg/m3.
Length of Pipe Hanging in Well - (Measured in Meter) - Length of Pipe Hanging in Well is essential in calculating all other values required in drilling.
STEP 1: Convert Input(s) to Base Unit
Lower Section of Drill String Length: 2.97 --> No Conversion Required
Mass Density of Steel: 7750 Kilogram per Cubic Meter --> 7750 Kilogram per Cubic Meter No Conversion Required
Length of Pipe Hanging in Well: 16 Meter --> 16 Meter No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
ρm = (Lcs)/L --> (2.97*7750)/16
Evaluating ... ...
ρm = 1438.59375
STEP 3: Convert Result to Output's Unit
1438.59375 Kilogram per Cubic Meter --> No Conversion Required
FINAL ANSWER
1438.59375 1438.594 Kilogram per Cubic Meter <-- Density of Drilling Mud
(Calculation completed in 00.020 seconds)

Credits

Created by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has created this Calculator and 2000+ more calculators!
Verified by M Naveen
National Institute of Technology (NIT), Warangal
M Naveen has verified this Calculator and 900+ more calculators!

18 Hydrostatics Calculators

Mass Density of Drilling Mud when Buoyant Force acts in Direction opposite to Gravity Force
Go Density of Drilling Mud = -((Effective Tension/([g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))-Mass Density of Steel))
Length of Pipe Hanging in Well given Effective Tension
Go Length of Pipe Hanging in Well = ((Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe)+Coordinate measured Downward from Top))
Coordinate measured Downward from Top given Effective Tension
Go Coordinate measured Downward from Top = -(Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe)-Length of Pipe Hanging in Well)
Mass Density of Steel when Buoyant Force acts in Direction opposite to Gravity Force
Go Mass Density of Steel = (Effective Tension/([g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))+Density of Drilling Mud)
Cross Section Area of Steel given Effective Tension
Go Cross Section Area of Steel in Pipe = Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))
Effective Tension given Buoyant Force acts in Direction opposite to Gravity Force
Go Effective Tension = (Mass Density of Steel-Density of Drilling Mud)*[g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top)
Coordinate measured Downward from Top given Tension on Vertical Drill String
Go Coordinate measured Downward from Top = -((Tension on Vertical Drill String/(Mass Density of Steel*[g]*Cross Section Area of Steel in Pipe))-Length of Pipe Hanging in Well)
Cross Section Area of Steel in Pipe given Tension on Vertical Drill String
Go Cross Section Area of Steel in Pipe = Tension on Vertical Drill String/(Mass Density of Steel*[g]*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))
Length of Pipe Hanging in Well given Tension on Vertical Drill String
Go Length of Pipe Hanging in Well = (Tension on Vertical Drill String/(Mass Density of Steel*[g]*Cross Section Area of Steel in Pipe))+Coordinate measured Downward from Top
Mass Density of Steel for Tension on Vertical Drill String
Go Mass Density of Steel = Tension on Vertical Drill String/([g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))
Tension on Vertical Drill String
Go Tension on Vertical Drill String = Mass Density of Steel*[g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top)
Length of Pipe Hanging in Well given Vertical Force at Bottom End of Drill String
Go Length of Pipe Hanging in Well = Vertical Force at Bottom end of Drill String/(Density of Drilling Mud*[g]*Cross Section Area of Steel in Pipe)
Mass Density of Drilling Mud given Vertical Force at Bottom End of Drill String
Go Density of Drilling Mud = Vertical Force at Bottom end of Drill String/([g]*Cross Section Area of Steel in Pipe*Length of Pipe Hanging in Well)
Vertical Force at Bottom End of Drill String
Go Vertical Force at Bottom end of Drill String = Density of Drilling Mud*[g]*Cross Section Area of Steel in Pipe*Length of Pipe Hanging in Well
Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression
Go Density of Drilling Mud = (Lower Section of Drill String Length*Mass Density of Steel)/Length of Pipe Hanging in Well
Length of Pipe Hanging given Lower Section of Drill String Length in Compression
Go Length of Pipe Hanging in Well = (Lower Section of Drill String Length*Mass Density of Steel)/Density of Drilling Mud
Mass Density of Steel for Lower Section of Drill String Length in Compression
Go Mass Density of Steel = (Density of Drilling Mud*Length of Pipe Hanging in Well)/Lower Section of Drill String Length
Lower Section of Drill String Length that is in Compression
Go Lower Section of Drill String Length = (Density of Drilling Mud*Length of Pipe Hanging in Well)/Mass Density of Steel

Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression Formula

Density of Drilling Mud = (Lower Section of Drill String Length*Mass Density of Steel)/Length of Pipe Hanging in Well
ρm = (Lc*ρs)/L

What is Buoyancy?

Buoyancy is the force that causes objects to float. It is the force exerted on an object that is partly or wholly immersed in a fluid. Buoyancy is caused by the differences in pressure acting on opposite sides of an object immersed in a static fluid. It is also known as the buoyant force.

How to Calculate Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression?

Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression calculator uses Density of Drilling Mud = (Lower Section of Drill String Length*Mass Density of Steel)/Length of Pipe Hanging in Well to calculate the Density of Drilling Mud, The Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression is the mass of the fluid per unit volume. The weight density w, of a fluid is the weight of the fluid per unit volume. Density of Drilling Mud is denoted by ρm symbol.

How to calculate Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression using this online calculator? To use this online calculator for Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression, enter Lower Section of Drill String Length (Lc), Mass Density of Steel s) & Length of Pipe Hanging in Well (L) and hit the calculate button. Here is how the Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression calculation can be explained with given input values -> 1438.594 = (2.97*7750)/16.

FAQ

What is Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression?
The Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression is the mass of the fluid per unit volume. The weight density w, of a fluid is the weight of the fluid per unit volume and is represented as ρm = (Lcs)/L or Density of Drilling Mud = (Lower Section of Drill String Length*Mass Density of Steel)/Length of Pipe Hanging in Well. Lower Section of Drill String Length that is in Compression depends on the density of the drilling mud, length of pipe in well and mass density of steel, Mass Density of Steel varies based on the alloying constituents but usually ranges between 7,750 and 8,050 kg/m3 & Length of Pipe Hanging in Well is essential in calculating all other values required in drilling.
How to calculate Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression?
The Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression is the mass of the fluid per unit volume. The weight density w, of a fluid is the weight of the fluid per unit volume is calculated using Density of Drilling Mud = (Lower Section of Drill String Length*Mass Density of Steel)/Length of Pipe Hanging in Well. To calculate Mass Density of Drilling Mud for Lower Section of Drill String Length in Compression, you need Lower Section of Drill String Length (Lc), Mass Density of Steel s) & Length of Pipe Hanging in Well (L). With our tool, you need to enter the respective value for Lower Section of Drill String Length, Mass Density of Steel & Length of Pipe Hanging in Well and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Density of Drilling Mud?
In this formula, Density of Drilling Mud uses Lower Section of Drill String Length, Mass Density of Steel & Length of Pipe Hanging in Well. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Density of Drilling Mud = -((Effective Tension/([g]*Cross Section Area of Steel in Pipe*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top))-Mass Density of Steel))
  • Density of Drilling Mud = Vertical Force at Bottom end of Drill String/([g]*Cross Section Area of Steel in Pipe*Length of Pipe Hanging in Well)
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!