Operator's Wage Rate given Machining and Operating Rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage)
Wo = (M-(Mt*(100+%Machine)/100))*100/(100+%Operator)
This formula uses 5 Variables
Variables Used
Wage Rate - Wage Rate is defined as the worker's/operator's rate of pay.
Machining and Operating Rate - Machining and Operating Rate is the money charged for processing on and operating machines per unit time, including overheads.
Depreciation Rate - Depreciation Rate is the rate at which the machine is depreciated across the estimated productive life of the machine.
Machine Overhead Percentage - Machine Overhead Percentage is the percentage of Capital spent on it, regardless of any work it performs.
Operator's Overhead Percentage - Operator's Overhead Percentage is the percentage of his Wage Rate spent indirectly on him, regardless of any revenue generated.
STEP 1: Convert Input(s) to Base Unit
Machining and Operating Rate: 100 --> No Conversion Required
Depreciation Rate: 0.1 --> No Conversion Required
Machine Overhead Percentage: 75 --> No Conversion Required
Operator's Overhead Percentage: 20 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Wo = (M-(Mt*(100+%Machine)/100))*100/(100+%Operator) --> (100-(0.1*(100+75)/100))*100/(100+20)
Evaluating ... ...
Wo = 83.1875
STEP 3: Convert Result to Output's Unit
83.1875 --> No Conversion Required
FINAL ANSWER
83.1875 <-- Wage Rate
(Calculation completed in 00.004 seconds)

Credits

Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

14 Estimation Cost Calculators

Operator's Overhead Percentage given Machining and Operating Rate
Go Operator's Overhead Percentage = ((Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/Wage Rate)-100
Machine Overhead Percentage given Machining and Operating Rate
Go Machine Overhead Percentage = ((Machining and Operating Rate-(Wage Rate*(100+Operator's Overhead Percentage)/100))*100/Depreciation Rate)-100
Operator's Wage Rate given Machining and Operating Rate
Go Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage)
Machining and Operating Rate
Go Machining and Operating Rate = (Wage Rate*(100+Operator's Overhead Percentage)/100)+(Depreciation Rate*(100+Machine Overhead Percentage)/100)
Cutting Edges used during Life of Holder given Estimated Tool Costs
Go Cutting Edges used during Life of Holder = Cost of the Holder/(Tool Cost-(Cost of Insert/Average Number of Cutting Edges used per Insert))
Average Cutting Edges used per insert given Estimated Tool Costs
Go Average Number of Cutting Edges used per Insert = Cost of Insert/(Tool Cost-(Cost of the Holder/Cutting Edges used during Life of Holder))
Cost of Insert given Tool Costs for Disposable-Insert Tool
Go Cost of Insert = Average Number of Cutting Edges Used Per Insert*(Tool Cost-(Cost of The Holder/Cutting Edges Used During Life of Holder))
Cost of Holder given Tool Costs for Disposable-Insert Tool
Go Cost of The Holder = Cutting Edges Used During Life of Holder*(Tool Cost-(Cost of Insert/Average Number of Cutting Edges Used Per Insert))
Estimated Tool Costs for Disposable-Insert Tool
Go Tool Cost = (Cost of Insert/Average Number of Cutting Edges Used Per Insert)+(Cost of The Holder/Cutting Edges Used During Life of Holder)
Initial Cost of Machine given Depreciation Rate
Go Initial Cost of the Machine = Amortization Period*Number of Working Hours Per Year*Depreciation Rate
Average Number of Regrinds Possible, given Estimated Tool Costs
Go Average Number of Regrinds Possible = Cost of a Tool/(Tool Cost-Cost of Grinding)
Cost of Re-grindable Tool given Estimated Tool Costs
Go Cost of a Tool = (Tool Cost-Cost of Grinding)*Average Number of Regrinds Possible
Cost of Grinding given Estimated Tool Costs
Go Cost of Grinding = Tool Cost-(Cost of a Tool/Average Number of Regrinds Possible)
Estimated Tool Costs for Re-grindable Tool
Go Tool Cost = Cost of Grinding+(Cost of a Tool/Average Number of Regrinds Possible)

Operator's Wage Rate given Machining and Operating Rate Formula

Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage)
Wo = (M-(Mt*(100+%Machine)/100))*100/(100+%Operator)

Operator's Overhead Cost

Operator's Overhead Cost refers to the ongoing expenses spent by the firm on the operators apart from his usual wage rate, which not directly attributes to creating a product or service. These often include the capital spent on facilities, insurance, etc.

How to Calculate Operator's Wage Rate given Machining and Operating Rate?

Operator's Wage Rate given Machining and Operating Rate calculator uses Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage) to calculate the Wage Rate, The Operator's Wage Rate given Machining and Operating Rate is a method to determine the maximum rate of Pay to the operator when total expense on Machining and Operating is limited. Wage Rate is denoted by Wo symbol.

How to calculate Operator's Wage Rate given Machining and Operating Rate using this online calculator? To use this online calculator for Operator's Wage Rate given Machining and Operating Rate, enter Machining and Operating Rate (M), Depreciation Rate (Mt), Machine Overhead Percentage (%Machine) & Operator's Overhead Percentage (%Operator) and hit the calculate button. Here is how the Operator's Wage Rate given Machining and Operating Rate calculation can be explained with given input values -> 83.1875 = (100-(0.1*(100+75)/100))*100/(100+20).

FAQ

What is Operator's Wage Rate given Machining and Operating Rate?
The Operator's Wage Rate given Machining and Operating Rate is a method to determine the maximum rate of Pay to the operator when total expense on Machining and Operating is limited and is represented as Wo = (M-(Mt*(100+%Machine)/100))*100/(100+%Operator) or Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage). Machining and Operating Rate is the money charged for processing on and operating machines per unit time, including overheads, Depreciation Rate is the rate at which the machine is depreciated across the estimated productive life of the machine, Machine Overhead Percentage is the percentage of Capital spent on it, regardless of any work it performs & Operator's Overhead Percentage is the percentage of his Wage Rate spent indirectly on him, regardless of any revenue generated.
How to calculate Operator's Wage Rate given Machining and Operating Rate?
The Operator's Wage Rate given Machining and Operating Rate is a method to determine the maximum rate of Pay to the operator when total expense on Machining and Operating is limited is calculated using Wage Rate = (Machining and Operating Rate-(Depreciation Rate*(100+Machine Overhead Percentage)/100))*100/(100+Operator's Overhead Percentage). To calculate Operator's Wage Rate given Machining and Operating Rate, you need Machining and Operating Rate (M), Depreciation Rate (Mt), Machine Overhead Percentage (%Machine) & Operator's Overhead Percentage (%Operator). With our tool, you need to enter the respective value for Machining and Operating Rate, Depreciation Rate, Machine Overhead Percentage & Operator's Overhead Percentage and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.