Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required Solution

STEP 0: Pre-Calculation Summary
Formula Used
Percent Active Polymer = (Active polymer/Neat polymer)
A = (P/Pn)
This formula uses 3 Variables
Variables Used
Percent Active Polymer - Percent Active polymer in the emulsion as supplied.
Active polymer - (Measured in Cubic Meter per Second) - Active polymer is a diverse class that can actuate and change shape in response to an environmental stimuli.
Neat polymer - (Measured in Cubic Meter per Second) - Neat polymer meaning they are essentially pure compounds and consist only of the molecules of the polymer produced.
STEP 1: Convert Input(s) to Base Unit
Active polymer: 3 Cubic Meter per Second --> 3 Cubic Meter per Second No Conversion Required
Neat polymer: 10 Cubic Meter per Second --> 10 Cubic Meter per Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
A = (P/Pn) --> (3/10)
Evaluating ... ...
A = 0.3
STEP 3: Convert Result to Output's Unit
0.3 --> No Conversion Required
FINAL ANSWER
0.3 <-- Percent Active Polymer
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

10+ Sizing a Polymer Dilution/Feed System Calculators

Drum Capacity given Time required to use One Drum of Polymer
Go Drum capacity = (Time required to use one drum of polymer*Neat polymer)
Neat Polymer given Time Required to Use One Drum of Polymer
Go Neat polymer = (Drum capacity/Time required to use one drum of polymer)
Time Required to Use One Drum of Polymer
Go Time required to use one drum of polymer = (Drum capacity/Neat polymer)
Active Polymer Dosage using Quantity of Active Polymer Required
Go Active Polymer Dosage = (Active polymer/Waste water flow)
Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required
Go Percent Active Polymer = (Active polymer/Neat polymer)
Active Polymer given Quantity of Neat Polymer Required
Go Active polymer = (Neat polymer*Percent Active Polymer)
Quantity of Neat Polymer Required
Go Neat polymer = (Active polymer/Percent Active Polymer)
Percent Solution Used given Quantity of Dilution Water Required
Go Solution used = (Active polymer/Dilution water)
Active Polymer using Quantity of Dilution Water Required
Go Active polymer = (Dilution water*Solution used)
Quantity of Dilution Water Required
Go Dilution water = (Active polymer/Solution used)

Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required Formula

Percent Active Polymer = (Active polymer/Neat polymer)
A = (P/Pn)

What is active polymer ?

Active polymers is a diverse class that can actuate and change shape in response to an environmental stimuli.These can be amorphous or glassy, semicrystalline, and liquid crystalline, and can activate in response to heat, light, solvent absorption, pH, and electrical field.

How to Calculate Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required?

Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required calculator uses Percent Active Polymer = (Active polymer/Neat polymer) to calculate the Percent Active Polymer, The Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required calculates the active polymer in percentage when we have prior information of neat polymer and active polymer. Percent Active Polymer is denoted by A symbol.

How to calculate Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required using this online calculator? To use this online calculator for Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required, enter Active polymer (P) & Neat polymer (Pn) and hit the calculate button. Here is how the Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required calculation can be explained with given input values -> 0.3 = (3/10).

FAQ

What is Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required?
The Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required calculates the active polymer in percentage when we have prior information of neat polymer and active polymer and is represented as A = (P/Pn) or Percent Active Polymer = (Active polymer/Neat polymer). Active polymer is a diverse class that can actuate and change shape in response to an environmental stimuli & Neat polymer meaning they are essentially pure compounds and consist only of the molecules of the polymer produced.
How to calculate Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required?
The Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required calculates the active polymer in percentage when we have prior information of neat polymer and active polymer is calculated using Percent Active Polymer = (Active polymer/Neat polymer). To calculate Percent Active Polymer in Emulsion using Quantity of Neat Polymer Required, you need Active polymer (P) & Neat polymer (Pn). With our tool, you need to enter the respective value for Active polymer & Neat polymer and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!