Raw Sludge Added Per Day given Digestion is Parabolic Solution

STEP 0: Pre-Calculation Summary
Formula Used
Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge)
V1 = ((3*V)/t)+(2*V2)
This formula uses 4 Variables
Variables Used
Raw sludge - (Measured in Cubic Meter per Day) - Raw sludge is defined as the volume of raw sludge added per day .
Volume of digester - (Measured in Cubic Meter) - Volume of digester is defined as the total capacity of the digester.
Digestion period - (Measured in Second) - Digestion period is the time required to complete the digestion.
Equivalent digested sludge - (Measured in Cubic Meter per Day) - Equivalent digested sludge is the volume of sludge produced per day.
STEP 1: Convert Input(s) to Base Unit
Volume of digester: 20 Cubic Meter --> 20 Cubic Meter No Conversion Required
Digestion period: 5 Second --> 5 Second No Conversion Required
Equivalent digested sludge: 3 Cubic Meter per Day --> 3 Cubic Meter per Day No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
V1 = ((3*V)/t)+(2*V2) --> ((3*20)/5)+(2*3)
Evaluating ... ...
V1 = 18
STEP 3: Convert Result to Output's Unit
0.000208333333333333 Cubic Meter per Second -->18 Cubic Meter per Day (Check conversion ​here)
FINAL ANSWER
18 Cubic Meter per Day <-- Raw sludge
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

8 Sludge Digestion Tank or Digesters Calculators

Volume of Digester given Number of Days for which Digested Sludge is Stored
​ Go Volume of digester = (((Raw sludge+Equivalent digested sludge)/2)*Digestion period)+(Equivalent digested sludge*Time in Days)
Number of Days for which Digested Sludge is Stored
​ Go Time in Days = (Volume of digester-(((Raw sludge+Equivalent digested sludge)/2)*Digestion period))/Equivalent digested sludge
Equivalent Digested Sludge Produced Per Day given Digestion Period
​ Go Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days)
Volume of Digester when Digestion is Parabolic
​ Go Volume of digester = (Raw sludge-((2*(Raw sludge-Equivalent digested sludge))/3))*Digestion period
Raw Sludge Added Per Day given Digestion is Parabolic
​ Go Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge)
Volume of Digester
​ Go Volume of digester = ((Raw sludge+Equivalent digested sludge)/2)*Digestion period
Equivalent Digested Sludge Produced Per Day given Raw Sludge Added Per Day
​ Go Equivalent digested sludge = Raw sludge/3
Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day
​ Go Raw sludge = 3*Equivalent digested sludge

Raw Sludge Added Per Day given Digestion is Parabolic Formula

Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge)
V1 = ((3*V)/t)+(2*V2)

What is the raw sludge ?

Raw sludge is untreated non-stabilized sludge, which can be taken from wastewater treatment plants. It tends to acidify digestion and produces odour.

How to Calculate Raw Sludge Added Per Day given Digestion is Parabolic?

Raw Sludge Added Per Day given Digestion is Parabolic calculator uses Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge) to calculate the Raw sludge, Raw Sludge Added Per Day given Digestion is Parabolic calculates raw sludge when we have prior information of other parameters used. Raw sludge is denoted by V1 symbol.

How to calculate Raw Sludge Added Per Day given Digestion is Parabolic using this online calculator? To use this online calculator for Raw Sludge Added Per Day given Digestion is Parabolic, enter Volume of digester (V), Digestion period (t) & Equivalent digested sludge (V2) and hit the calculate button. Here is how the Raw Sludge Added Per Day given Digestion is Parabolic calculation can be explained with given input values -> 1.6E+6 = ((3*20)/5)+(2*3.47222222222222E-05).

FAQ

What is Raw Sludge Added Per Day given Digestion is Parabolic?
Raw Sludge Added Per Day given Digestion is Parabolic calculates raw sludge when we have prior information of other parameters used and is represented as V1 = ((3*V)/t)+(2*V2) or Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge). Volume of digester is defined as the total capacity of the digester, Digestion period is the time required to complete the digestion & Equivalent digested sludge is the volume of sludge produced per day.
How to calculate Raw Sludge Added Per Day given Digestion is Parabolic?
Raw Sludge Added Per Day given Digestion is Parabolic calculates raw sludge when we have prior information of other parameters used is calculated using Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge). To calculate Raw Sludge Added Per Day given Digestion is Parabolic, you need Volume of digester (V), Digestion period (t) & Equivalent digested sludge (V2). With our tool, you need to enter the respective value for Volume of digester, Digestion period & Equivalent digested sludge and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Raw sludge?
In this formula, Raw sludge uses Volume of digester, Digestion period & Equivalent digested sludge. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Raw sludge = 3*Equivalent digested sludge
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!