Size of Batch given Total Machining Time Solution

STEP 0: Pre-Calculation Summary
Formula Used
Batch Size = Total Machining Time/Machining Time
Nb = TMT/tm
This formula uses 3 Variables
Variables Used
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
Total Machining Time - (Measured in Second) - Total Machining Time is the total processing time required on one or more machines to produce a batch of products.
Machining Time - (Measured in Second) - Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
STEP 1: Convert Input(s) to Base Unit
Total Machining Time: 100 Minute --> 6000 Second (Check conversion here)
Machining Time: 46 Second --> 46 Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Nb = TMT/tm --> 6000/46
Evaluating ... ...
Nb = 130.434782608696
STEP 3: Convert Result to Output's Unit
130.434782608696 --> No Conversion Required
FINAL ANSWER
130.434782608696 130.4348 <-- Batch Size
(Calculation completed in 00.004 seconds)

Credits

Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

22 Economics Of Metal-Cutting Operation Calculators

Total Production Time given Time for Individual Operation and Batch Size
Go Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool)
Non-Productive Time for Each Component given Average Production Time
Go Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size))
Time for changing one Tool given Average Production Time
Go Time to Change One Tool = (Average Production Time-(Setup Time+Machining Time))*Batch Size/Number of Tools Used
Machining Time of Each Component given Average Production Time
Go Machining Time = Average Production Time-Setup Time-(Number of Tools Used*Time to Change One Tool/Batch Size)
Batch Size given Average Production Time
Go Batch Size = Time to Change One Tool*Number of Tools Used/(Average Production Time-(Setup Time+Machining Time))
Average Production Time of Each Component
Go Average Production Time = Setup Time+Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)
Total Production Time
Go Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time)
Machining and Operating Rate given Total Machining and Operating Cost
Go Machining and Operating Rate = Total Machining And Operating Cost/Total Production Time
Total Production Time given Total Machining and Operating Cost
Go Total Production Time = Total Machining And Operating Cost/Machining and Operating Rate
Total Machining and Operating Cost
Go Total Machining And Operating Cost = Machining and Operating Rate*Total Production Time
Total Non-Productive Cost
Go Total Production Cost = Non-Productive Time*Machining and Operating Rate
Total Tool-Changing Cost
Go Total Tool Changing Cost = Total Tool Changing Time*Number of Tools Used
Time for Changing one Tool given Total Tool Changing Time
Go Time to Change One Tool = Total Tool Changing Time/Number of Tools Used
Total Tool Changing Time
Go Total Tool Changing Time = Number of Tools Used*Time to Change One Tool
Cost of Tool given Total Cost of Tools
Go Cost of a Tool = Total Cost of Tools Used/Number of Tools Used
Total Cost of Tools Used
Go Total Cost of Tools Used = Number of Tools Used*Cost of a Tool
Machining Time for one Component using Total Machining Time
Go Machining Time = Total Machining Time/Batch Size
Total Machining Time or Total Machine Time
Go Total Machining Time = Batch Size*Machining Time
Size of Batch given Total Machining Time
Go Batch Size = Total Machining Time/Machining Time
Load or Unload or Setup Time given Total Non-Productive Time
Go Setup Time = Non-Productive Time/Batch Size
Size of Batch using Total Non-Productive Time
Go Batch Size = Non-Productive Time/Setup Time
Total Non-Productive Time
Go Non-Productive Time = Batch Size*Setup Time

Size of Batch given Total Machining Time Formula

Batch Size = Total Machining Time/Machining Time
Nb = TMT/tm

Ideal Capacity of a Machine Tool

The desired characteristics of a Machine Toole are:
1. Powerful and high Strength
2. Rigid and Stable
3. Tools allows much higher Cutting Velocity, if required and permissible
4. Low wear

How to Calculate Size of Batch given Total Machining Time?

Size of Batch given Total Machining Time calculator uses Batch Size = Total Machining Time/Machining Time to calculate the Batch Size, The Size of Batch given Total Machining Time is a method to determine the maximum production capacity of a plant when the total time available for machining is known. Batch Size is denoted by Nb symbol.

How to calculate Size of Batch given Total Machining Time using this online calculator? To use this online calculator for Size of Batch given Total Machining Time, enter Total Machining Time (TMT) & Machining Time (tm) and hit the calculate button. Here is how the Size of Batch given Total Machining Time calculation can be explained with given input values -> 130.4348 = 6000/46.

FAQ

What is Size of Batch given Total Machining Time?
The Size of Batch given Total Machining Time is a method to determine the maximum production capacity of a plant when the total time available for machining is known and is represented as Nb = TMT/tm or Batch Size = Total Machining Time/Machining Time. Total Machining Time is the total processing time required on one or more machines to produce a batch of products & Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
How to calculate Size of Batch given Total Machining Time?
The Size of Batch given Total Machining Time is a method to determine the maximum production capacity of a plant when the total time available for machining is known is calculated using Batch Size = Total Machining Time/Machining Time. To calculate Size of Batch given Total Machining Time, you need Total Machining Time (TMT) & Machining Time (tm). With our tool, you need to enter the respective value for Total Machining Time & Machining Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Batch Size?
In this formula, Batch Size uses Total Machining Time & Machining Time. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Batch Size = Non-Productive Time/Setup Time
  • Batch Size = Time to Change One Tool*Number of Tools Used/(Average Production Time-(Setup Time+Machining Time))
Let Others Know