Load Current (1-Phase 2-Wire Mid-Point Earthed) Solution

STEP 0: Pre-Calculation Summary
Formula Used
Current Underground AC = (sqrt(2)*Power Transmitted)/(Maximum Voltage Underground AC*cos(Phase Difference))
I = (sqrt(2)*P)/(Vm*cos(Φ))
This formula uses 2 Functions, 4 Variables
Functions Used
cos - Cosine of an angle is the ratio of the side adjacent to the angle to the hypotenuse of the triangle., cos(Angle)
sqrt - A square root function is a function that takes a non-negative number as an input and returns the square root of the given input number., sqrt(Number)
Variables Used
Current Underground AC - (Measured in Ampere) - Current Underground AC is defined as the current flowing through the overhead ac supply wire.
Power Transmitted - (Measured in Watt) - Power Transmitted is the amount of power that is transferred from its place of generation to a location where it is applied to perform useful work.
Maximum Voltage Underground AC - (Measured in Volt) - Maximum Voltage Underground AC is defined as the peak amplitude of the AC voltage supplied to the line or wire.
Phase Difference - (Measured in Radian) - Phase Difference is defined as the difference between the phasor of apparent and real power (in degrees) or between voltage and current in an ac circuit.
STEP 1: Convert Input(s) to Base Unit
Power Transmitted: 300 Watt --> 300 Watt No Conversion Required
Maximum Voltage Underground AC: 230 Volt --> 230 Volt No Conversion Required
Phase Difference: 30 Degree --> 0.5235987755982 Radian (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
I = (sqrt(2)*P)/(Vm*cos(Φ)) --> (sqrt(2)*300)/(230*cos(0.5235987755982))
Evaluating ... ...
I = 2.12999108068102
STEP 3: Convert Result to Output's Unit
2.12999108068102 Ampere --> No Conversion Required
FINAL ANSWER
2.12999108068102 2.129991 Ampere <-- Current Underground AC
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Urvi Rathod
Vishwakarma Government Engineering College (VGEC), Ahmedabad
Urvi Rathod has created this Calculator and 1500+ more calculators!
Verifier Image
Verified by Kethavath Srinath
Osmania University (OU), Hyderabad
Kethavath Srinath has verified this Calculator and 1200+ more calculators!

8 Current & Voltage Calculators

Maximum Voltage using Area of X-Section (1-Phase 2-Wire Mid-Point Earthed)
​ Go Maximum Voltage Underground AC = ((2*Power Transmitted)/cos(Phase Difference))*sqrt(Resistivity*Length of Underground AC Wire/(Area of Underground AC Wire*Line Losses))
RMS Voltage using Area of X-Section (1-Phase 2-Wire Mid-Point Earthed)
​ Go Root Mean Square Voltage = (Power Transmitted/cos(Phase Difference))*sqrt(2*Resistivity*Length of Underground AC Wire/(Area of Underground AC Wire*Line Losses))
Maximum Voltage using Line Losses (1-Phase 2-Wire Mid-Point Earthed)
​ Go Maximum Voltage Underground AC = ((2*Power Transmitted)/cos(Phase Difference))*sqrt(Resistance Underground AC/Line Losses)
RMS Voltage using Line Losses (1-Phase 2-Wire Mid-Point Earthed)
​ Go Root Mean Square Voltage = (Power Transmitted/cos(Phase Difference))*sqrt((2*Resistance Underground AC)/Line Losses)
Maximum Voltage using Load Current (1-Phase 2-Wire Mid-Point Earthed)
​ Go Maximum Voltage Underground AC = (sqrt(2)*Power Transmitted)/(Current Underground AC*cos(Phase Difference))
Load Current (1-Phase 2-Wire Mid-Point Earthed)
​ Go Current Underground AC = (sqrt(2)*Power Transmitted)/(Maximum Voltage Underground AC*cos(Phase Difference))
RMS Voltage using Load Current (1-Phase 2-Wire Mid-Point Earthed)
​ Go Root Mean Square Voltage = Power Transmitted/(Current Underground AC*cos(Phase Difference))
Load Current using Line Losses (1-Phase 2-Wire Mid-Point Earthed)
​ Go Current Underground AC = sqrt(Line Losses/(2*Resistance Underground AC))

Load Current (1-Phase 2-Wire Mid-Point Earthed) Formula

Current Underground AC = (sqrt(2)*Power Transmitted)/(Maximum Voltage Underground AC*cos(Phase Difference))
I = (sqrt(2)*P)/(Vm*cos(Φ))

What is a load in a circuit?

An electrical load is an electrical component or portion of a circuit that consumes (active) electric power, such as electrical appliances and lights inside the home. The term may also refer to the power consumed by a circuit. This is opposed to a power source, such as a battery or generator, which produces power.

How to Calculate Load Current (1-Phase 2-Wire Mid-Point Earthed)?

Load Current (1-Phase 2-Wire Mid-Point Earthed) calculator uses Current Underground AC = (sqrt(2)*Power Transmitted)/(Maximum Voltage Underground AC*cos(Phase Difference)) to calculate the Current Underground AC, The Load Current (1-phase 2-wire Mid-point Earthed) formula is defined as the current that flows into the load of the single-phase two-wire mid-point earthed underground system. Current Underground AC is denoted by I symbol.

How to calculate Load Current (1-Phase 2-Wire Mid-Point Earthed) using this online calculator? To use this online calculator for Load Current (1-Phase 2-Wire Mid-Point Earthed), enter Power Transmitted (P), Maximum Voltage Underground AC (Vm) & Phase Difference (Φ) and hit the calculate button. Here is how the Load Current (1-Phase 2-Wire Mid-Point Earthed) calculation can be explained with given input values -> 2.129991 = (sqrt(2)*300)/(230*cos(0.5235987755982)).

FAQ

What is Load Current (1-Phase 2-Wire Mid-Point Earthed)?
The Load Current (1-phase 2-wire Mid-point Earthed) formula is defined as the current that flows into the load of the single-phase two-wire mid-point earthed underground system and is represented as I = (sqrt(2)*P)/(Vm*cos(Φ)) or Current Underground AC = (sqrt(2)*Power Transmitted)/(Maximum Voltage Underground AC*cos(Phase Difference)). Power Transmitted is the amount of power that is transferred from its place of generation to a location where it is applied to perform useful work, Maximum Voltage Underground AC is defined as the peak amplitude of the AC voltage supplied to the line or wire & Phase Difference is defined as the difference between the phasor of apparent and real power (in degrees) or between voltage and current in an ac circuit.
How to calculate Load Current (1-Phase 2-Wire Mid-Point Earthed)?
The Load Current (1-phase 2-wire Mid-point Earthed) formula is defined as the current that flows into the load of the single-phase two-wire mid-point earthed underground system is calculated using Current Underground AC = (sqrt(2)*Power Transmitted)/(Maximum Voltage Underground AC*cos(Phase Difference)). To calculate Load Current (1-Phase 2-Wire Mid-Point Earthed), you need Power Transmitted (P), Maximum Voltage Underground AC (Vm) & Phase Difference (Φ). With our tool, you need to enter the respective value for Power Transmitted, Maximum Voltage Underground AC & Phase Difference and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Current Underground AC?
In this formula, Current Underground AC uses Power Transmitted, Maximum Voltage Underground AC & Phase Difference. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Current Underground AC = sqrt(Line Losses/(2*Resistance Underground AC))
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!