Man Hour = Number of Disabling Injuries*100000/Injury Frequency Rate
Nmh = In*100000/Ir
This formula uses 3 Variables
Variables Used
Man Hour - Man Hour is used to measure the efforts needed to complete a task. 1 man hour is work completed in an hour of uninterrupted effort by an average worker.
Number of Disabling Injuries - Number of Disabling Injuries refers to the injuries that result in either death or permanent disability, or temporary total disability after the day of injury.
Injury Frequency Rate - Injury Frequency Rate defines the number of disabling injuries per one lakh man hours worked.
STEP 1: Convert Input(s) to Base Unit
Number of Disabling Injuries: 20 --> No Conversion Required
Injury Frequency Rate: 800 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Nmh = In*100000/Ir --> 20*100000/800
Evaluating ... ...
Nmh = 2500
STEP 3: Convert Result to Output's Unit
2500 --> No Conversion Required
FINAL ANSWER
2500 <-- Man Hour
(Calculation completed in 00.004 seconds)

Credits

Created by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has created this Calculator and 500+ more calculators!
Verified by Mithila Muthamma PA
Coorg Institute of Technology (CIT), Coorg
Mithila Muthamma PA has verified this Calculator and 700+ more calculators!

8 Construction Safety Management Calculators

Injury Frequency Rate given Injury Index
Go Injury Frequency Rate = Injury Index*1000/(Number of Disabling Injuries*Injury Severity Rate)
Severity Rate given Injury Index
Go Injury Severity Rate = Injury Index*1000/(Number of Disabling Injuries*Injury Frequency Rate)
Injury Index
Go Injury Index = Injury Frequency Rate*Injury Severity Rate*Number of Disabling Injuries/1000
Number of Disabling Injuries given Frequency Rate
Go Number of Disabling Injuries = Injury Frequency Rate*Man Hour/100000
Number of Man-Hour Worked given Frequency Rate
Go Man Hour = Number of Disabling Injuries*100000/Injury Frequency Rate
Injury Frequency Rate
Go Injury Frequency Rate = Number of Disabling Injuries*100000/Man Hour
Number of Days Lost given Severity Rate
Go Lost Days = Injury Severity Rate*Man Hour/1000
Injury Severity Rate
Go Injury Severity Rate = Lost Days*1000/Man Hour

Number of Man-Hour Worked given Frequency Rate Formula

Man Hour = Number of Disabling Injuries*100000/Injury Frequency Rate
Nmh = In*100000/Ir

What are the Approaches to Improve Safety in Construction Field?

Many rules and recommendations have been laid down as the result of research by societies, organizations and institutions on how to improve safety. Recognizing the importance of safety performance, a contractor can approach the problem in four different ways.
1 Organizational approach
i. Safety departments
ii. Committee
iii. Field Procedures
iv. Incentives
v. Safety Cost
2 Physical Approach
3 Economic incentives
4 Behavioral Approach

What is Disabling Injury?

The disabling injury means an injury which causes a loss of working time beyond the term, shift or day during which the injury occurred. Thus injury-frequency rate denotes how frequently accidents occurred. Bat it does not take into account the time lost because of an injury.

How to Calculate Number of Man-Hour Worked given Frequency Rate?

Number of Man-Hour Worked given Frequency Rate calculator uses Man Hour = Number of Disabling Injuries*100000/Injury Frequency Rate to calculate the Man Hour, The Number of Man-Hour Worked given Frequency Rate formula is defined as the amount of work performed by the average worker in one hour. Man Hour is denoted by Nmh symbol.

How to calculate Number of Man-Hour Worked given Frequency Rate using this online calculator? To use this online calculator for Number of Man-Hour Worked given Frequency Rate, enter Number of Disabling Injuries (In) & Injury Frequency Rate (Ir) and hit the calculate button. Here is how the Number of Man-Hour Worked given Frequency Rate calculation can be explained with given input values -> 2500 = 20*100000/800.

FAQ

What is Number of Man-Hour Worked given Frequency Rate?
The Number of Man-Hour Worked given Frequency Rate formula is defined as the amount of work performed by the average worker in one hour and is represented as Nmh = In*100000/Ir or Man Hour = Number of Disabling Injuries*100000/Injury Frequency Rate. Number of Disabling Injuries refers to the injuries that result in either death or permanent disability, or temporary total disability after the day of injury & Injury Frequency Rate defines the number of disabling injuries per one lakh man hours worked.
How to calculate Number of Man-Hour Worked given Frequency Rate?
The Number of Man-Hour Worked given Frequency Rate formula is defined as the amount of work performed by the average worker in one hour is calculated using Man Hour = Number of Disabling Injuries*100000/Injury Frequency Rate. To calculate Number of Man-Hour Worked given Frequency Rate, you need Number of Disabling Injuries (In) & Injury Frequency Rate (Ir). With our tool, you need to enter the respective value for Number of Disabling Injuries & Injury Frequency Rate and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!