Percent Compaction of Soil in Sand Cone Method Solution

STEP 0: Pre-Calculation Summary
Formula Used
Percent Compaction = (100*Dry Density)/Dry Density Maximum
C = (100*ρd)/γdmax
This formula uses 3 Variables
Variables Used
Percent Compaction - Percent Compaction means the compaction of soil from its field state when load is applied.
Dry Density - (Measured in Kilogram per Cubic Meter) - Dry Density is the ratio of mass of dry soil to its volume.
Dry Density Maximum - (Measured in Kilogram per Cubic Meter) - Dry Density Maximum of soil is the ratio of the mass of dry soil to its volume.
STEP 1: Convert Input(s) to Base Unit
Dry Density: 10 Kilogram per Cubic Meter --> 10 Kilogram per Cubic Meter No Conversion Required
Dry Density Maximum: 4.76 Kilogram per Cubic Meter --> 4.76 Kilogram per Cubic Meter No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
C = (100*ρd)/γdmax --> (100*10)/4.76
Evaluating ... ...
C = 210.084033613445
STEP 3: Convert Result to Output's Unit
210.084033613445 --> No Conversion Required
FINAL ANSWER
210.084033613445 210.084 <-- Percent Compaction
(Calculation completed in 00.020 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Mridul Sharma
Indian Institute of Information Technology (IIIT), Bhopal
Mridul Sharma has verified this Calculator and 1700+ more calculators!

24 Soil Compaction Test Calculators

Cross-sectional Area of Soil Conveying Flow given Rate of Flow of Water
Go Cross Sectional Area in Permeability = (Rate of Flow of Water through Soil/(Coefficient of Permeability*Hydraulic Gradient in Soil))
Coefficient of Permeability given Rate of Flow of Water
Go Coefficient of Permeability = (Rate of Flow of Water through Soil/(Hydraulic Gradient in Soil*Cross Sectional Area in Permeability))
Hydraulic Gradient given Rate of Flow of Water
Go Hydraulic Gradient in Soil = (Rate of Flow of Water through Soil/(Coefficient of Permeability*Cross Sectional Area in Permeability))
Rate of Flow of Water through Saturated Soil by Darcy's Law
Go Rate of Flow of Water through Soil = (Coefficient of Permeability*Hydraulic Gradient in Soil*Cross Sectional Area in Permeability)
Settlement of Plate in Load Bearing Test
Go Settlement of Plate = Settlement Foundation*((1+Width of Full Size Bearing Plate)/(2*Width of Full Size Bearing Plate))^2
Width of Full Size Bearing Plate in Load Bearing Test
Go Width of Full Size Bearing Plate = (1/(2*sqrt(Settlement of Plate/Settlement Foundation)-1))
Weight of Moist Soil given Percent Moisture in Sand Cone Method
Go Weight of Moist Soil = ((Percent Moisture*Weight of Dry Soil/100)+Weight of Dry Soil)
Percent Moisture in Sand Cone Method
Go Percent Moisture = (100*(Weight of Moist Soil-Weight of Dry Soil))/Weight of Dry Soil
Force per Unit Area Required for Penetration of Standard Material given CBR
Go Force Per Unit Area Stand. = (Force per Unit Area/California Bearing Ratio)
California Bearing Ratio for Strength of Soil that Underlies Pavement
Go California Bearing Ratio = (Force per Unit Area/Force Per Unit Area Stand.)
Force per Unit Area Required to Penetrate Soil Mass with Circular Piston given CBR
Go Force per Unit Area = California Bearing Ratio*Force Per Unit Area Stand.
Weight of Dry Soil given Percent Moisture in Sand Cone Method
Go Weight of Dry Soil = (100*Weight of Moist Soil)/(Percent Moisture+100)
Field Density of Soil given Dry Density of Soil in Sand Cone Method
Go Bulk Density of Soil = (Dry Density*(1+(Percent Moisture/100)))
Dry Density of Soil in Sand Cone Method
Go Dry Density = (Bulk Density of Soil/(1+(Percent Moisture/100)))
Percent Moisture Content given Dry Density of Soil in Sand Cone Method
Go Percent Moisture = 100*((Bulk Density of Soil/Dry Density)-1)
Weight of Soil given Field Density in Sand Cone Method
Go Weight of Total Soil = (Bulk Density of Soil*Volume of Soil)
Volume of Soil given Field Density in Sand Cone Method
Go Volume of Soil = (Weight of Total Soil/Bulk Density of Soil)
Field Density in Sand Cone Method
Go Bulk Density of Soil = (Weight of Total Soil/Volume of Soil)
Dry Density of Soil given Percent Compaction of Soil in Sand Cone Method
Go Dry Density = (Percent Compaction*Dry Density Maximum)/100
Percent Compaction of Soil in Sand Cone Method
Go Percent Compaction = (100*Dry Density)/Dry Density Maximum
Weight of Sand Filling Hole given Volume of Soil for Sand Filling in Sand Cone Method
Go Weight of Total Soil = (Volume of Soil*Density of Sand)
Density of Sand given Volume of Soil for Sand Filling in Sand Cone Method
Go Density of Sand = (Weight of Total Soil/Volume of Soil)
Volume of Soil for Sand Filling in Sand Cone Method
Go Volume of Soil = (Weight of Total Soil/Density of Sand)
Maximum Dry Density given Percent Compaction of Soil in Sand Cone Method
Go Dry Density Maximum = (Dry Density)/Percent Compaction

Percent Compaction of Soil in Sand Cone Method Formula

Percent Compaction = (100*Dry Density)/Dry Density Maximum
C = (100*ρd)/γdmax

What is Percent Compaction?

The ratio, expressed as a percentage, of dry unit weight of a soil to maximum unit weight obtained in a laboratory compaction test.The percent relative compaction is computed by dividing the dry density of the material from the test site by that material's moisture density relation curve's maximum dry density, and multiply by 100%.

How to Calculate Percent Compaction of Soil in Sand Cone Method?

Percent Compaction of Soil in Sand Cone Method calculator uses Percent Compaction = (100*Dry Density)/Dry Density Maximum to calculate the Percent Compaction, The Percent Compaction of Soil in Sand Cone Method is defined as the ratio, expressed as a percentage, of dry unit weight of a soil to maximum unit weight. Percent Compaction is denoted by C symbol.

How to calculate Percent Compaction of Soil in Sand Cone Method using this online calculator? To use this online calculator for Percent Compaction of Soil in Sand Cone Method, enter Dry Density d) & Dry Density Maximum dmax) and hit the calculate button. Here is how the Percent Compaction of Soil in Sand Cone Method calculation can be explained with given input values -> 200 = (100*10)/4.76.

FAQ

What is Percent Compaction of Soil in Sand Cone Method?
The Percent Compaction of Soil in Sand Cone Method is defined as the ratio, expressed as a percentage, of dry unit weight of a soil to maximum unit weight and is represented as C = (100*ρd)/γdmax or Percent Compaction = (100*Dry Density)/Dry Density Maximum. Dry Density is the ratio of mass of dry soil to its volume & Dry Density Maximum of soil is the ratio of the mass of dry soil to its volume.
How to calculate Percent Compaction of Soil in Sand Cone Method?
The Percent Compaction of Soil in Sand Cone Method is defined as the ratio, expressed as a percentage, of dry unit weight of a soil to maximum unit weight is calculated using Percent Compaction = (100*Dry Density)/Dry Density Maximum. To calculate Percent Compaction of Soil in Sand Cone Method, you need Dry Density d) & Dry Density Maximum dmax). With our tool, you need to enter the respective value for Dry Density & Dry Density Maximum and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.