Percent Moisture Content given Dry Density of Soil in Sand Cone Method Solution

STEP 0: Pre-Calculation Summary
Formula Used
Percent Moisture = 100*((Bulk Density of Soil/Dry Density)-1)
M = 100*((γt/ρd)-1)
This formula uses 3 Variables
Variables Used
Percent Moisture - Percent Moisture tell us about the moisture content of soil at field.
Bulk Density of Soil - (Measured in Kilogram per Cubic Meter) - Bulk Density of Soil is the ratio of total mass of soil to total volume.
Dry Density - (Measured in Kilogram per Cubic Meter) - Dry Density is the ratio of mass of dry soil to its volume.
STEP 1: Convert Input(s) to Base Unit
Bulk Density of Soil: 12 Kilogram per Cubic Meter --> 12 Kilogram per Cubic Meter No Conversion Required
Dry Density: 10 Kilogram per Cubic Meter --> 10 Kilogram per Cubic Meter No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
M = 100*((γtd)-1) --> 100*((12/10)-1)
Evaluating ... ...
M = 20
STEP 3: Convert Result to Output's Unit
20 --> No Conversion Required
FINAL ANSWER
20 <-- Percent Moisture
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

24 Soil Compaction Test Calculators

Cross-sectional Area of Soil Conveying Flow given Rate of Flow of Water
Go Cross Sectional Area in Permeability = (Rate of Flow of Water through Soil/(Coefficient of Permeability*Hydraulic Gradient in Soil))
Coefficient of Permeability given Rate of Flow of Water
Go Coefficient of Permeability = (Rate of Flow of Water through Soil/(Hydraulic Gradient in Soil*Cross Sectional Area in Permeability))
Hydraulic Gradient given Rate of Flow of Water
Go Hydraulic Gradient in Soil = (Rate of Flow of Water through Soil/(Coefficient of Permeability*Cross Sectional Area in Permeability))
Rate of Flow of Water through Saturated Soil by Darcy's Law
Go Rate of Flow of Water through Soil = (Coefficient of Permeability*Hydraulic Gradient in Soil*Cross Sectional Area in Permeability)
Settlement of Plate in Load Bearing Test
Go Settlement of Plate = Settlement Foundation*((1+Width of Full Size Bearing Plate)/(2*Width of Full Size Bearing Plate))^2
Width of Full Size Bearing Plate in Load Bearing Test
Go Width of Full Size Bearing Plate = (1/(2*sqrt(Settlement of Plate/Settlement Foundation)-1))
Weight of Moist Soil given Percent Moisture in Sand Cone Method
Go Weight of Moist Soil = ((Percent Moisture*Weight of Dry Soil/100)+Weight of Dry Soil)
Percent Moisture in Sand Cone Method
Go Percent Moisture = (100*(Weight of Moist Soil-Weight of Dry Soil))/Weight of Dry Soil
Force per Unit Area Required for Penetration of Standard Material given CBR
Go Force Per Unit Area Stand. = (Force per Unit Area/California Bearing Ratio)
California Bearing Ratio for Strength of Soil that Underlies Pavement
Go California Bearing Ratio = (Force per Unit Area/Force Per Unit Area Stand.)
Force per Unit Area Required to Penetrate Soil Mass with Circular Piston given CBR
Go Force per Unit Area = California Bearing Ratio*Force Per Unit Area Stand.
Weight of Dry Soil given Percent Moisture in Sand Cone Method
Go Weight of Dry Soil = (100*Weight of Moist Soil)/(Percent Moisture+100)
Field Density of Soil given Dry Density of Soil in Sand Cone Method
Go Bulk Density of Soil = (Dry Density*(1+(Percent Moisture/100)))
Dry Density of Soil in Sand Cone Method
Go Dry Density = (Bulk Density of Soil/(1+(Percent Moisture/100)))
Percent Moisture Content given Dry Density of Soil in Sand Cone Method
Go Percent Moisture = 100*((Bulk Density of Soil/Dry Density)-1)
Weight of Soil given Field Density in Sand Cone Method
Go Weight of Total Soil = (Bulk Density of Soil*Volume of Soil)
Volume of Soil given Field Density in Sand Cone Method
Go Volume of Soil = (Weight of Total Soil/Bulk Density of Soil)
Field Density in Sand Cone Method
Go Bulk Density of Soil = (Weight of Total Soil/Volume of Soil)
Dry Density of Soil given Percent Compaction of Soil in Sand Cone Method
Go Dry Density = (Percent Compaction*Dry Density Maximum)/100
Percent Compaction of Soil in Sand Cone Method
Go Percent Compaction = (100*Dry Density)/Dry Density Maximum
Weight of Sand Filling Hole given Volume of Soil for Sand Filling in Sand Cone Method
Go Weight of Total Soil = (Volume of Soil*Density of Sand)
Density of Sand given Volume of Soil for Sand Filling in Sand Cone Method
Go Density of Sand = (Weight of Total Soil/Volume of Soil)
Volume of Soil for Sand Filling in Sand Cone Method
Go Volume of Soil = (Weight of Total Soil/Density of Sand)
Maximum Dry Density given Percent Compaction of Soil in Sand Cone Method
Go Dry Density Maximum = (Dry Density)/Percent Compaction

Percent Moisture Content given Dry Density of Soil in Sand Cone Method Formula

Percent Moisture = 100*((Bulk Density of Soil/Dry Density)-1)
M = 100*((γt/ρd)-1)

What is Dry Density of Soil?

Dry density is calculated by dividing the weight of the wet soil by its water content in percent. The percent compaction for the field density test is calculated by dividing the dry density of the soil by the maximum dry density from the proctor test.

How to Calculate Percent Moisture Content given Dry Density of Soil in Sand Cone Method?

Percent Moisture Content given Dry Density of Soil in Sand Cone Method calculator uses Percent Moisture = 100*((Bulk Density of Soil/Dry Density)-1) to calculate the Percent Moisture, The Percent Moisture Content given Dry Density of Soil in Sand Cone Method is defined as moisture content in soil present at field when we have prior knowledge of the dry density of soil. Percent Moisture is denoted by M symbol.

How to calculate Percent Moisture Content given Dry Density of Soil in Sand Cone Method using this online calculator? To use this online calculator for Percent Moisture Content given Dry Density of Soil in Sand Cone Method, enter Bulk Density of Soil t) & Dry Density d) and hit the calculate button. Here is how the Percent Moisture Content given Dry Density of Soil in Sand Cone Method calculation can be explained with given input values -> 20 = 100*((12/10)-1).

FAQ

What is Percent Moisture Content given Dry Density of Soil in Sand Cone Method?
The Percent Moisture Content given Dry Density of Soil in Sand Cone Method is defined as moisture content in soil present at field when we have prior knowledge of the dry density of soil and is represented as M = 100*((γtd)-1) or Percent Moisture = 100*((Bulk Density of Soil/Dry Density)-1). Bulk Density of Soil is the ratio of total mass of soil to total volume & Dry Density is the ratio of mass of dry soil to its volume.
How to calculate Percent Moisture Content given Dry Density of Soil in Sand Cone Method?
The Percent Moisture Content given Dry Density of Soil in Sand Cone Method is defined as moisture content in soil present at field when we have prior knowledge of the dry density of soil is calculated using Percent Moisture = 100*((Bulk Density of Soil/Dry Density)-1). To calculate Percent Moisture Content given Dry Density of Soil in Sand Cone Method, you need Bulk Density of Soil t) & Dry Density d). With our tool, you need to enter the respective value for Bulk Density of Soil & Dry Density and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Percent Moisture?
In this formula, Percent Moisture uses Bulk Density of Soil & Dry Density. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Percent Moisture = (100*(Weight of Moist Soil-Weight of Dry Soil))/Weight of Dry Soil