Priority of objective period of design given minimum design index Solution

STEP 0: Pre-Calculation Summary
Formula Used
Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index
Pt = ((DImin*100)-(WI*Pw)-(CI*Pc))/TI
This formula uses 7 Variables
Variables Used
Period Priority (%) - Period Priority (%) is a factor which shows the priority of Time factor of on a percentage scale. It is oriented according to the user's definition of priorities.
Minimum Design Index - Minimum Design Index is a comparable quantity in conceptual design phase which considers Cost, Weight and Time period indices.
Weight Index - Weight index is the summation of all the contributors in weight configuration parameters. The weight configuration parameters are valued on the scale of 0-10 (best=10 and worst=0).
Weight Priority (%) - Weight Priority (%) is a factor which shows the priority of Weight factor on a percentage scale. It is oriented according to the user's definition of priorities.
Cost Index - Cost index is the summation of all the contributors in cost configuration parameters. The cost configuration parameters are valued on the scale of 0-10 (best=10 and worst=0).
Cost Priority (%) - Cost Priority (%) is a factor which shows the priority of cost objective on a percentage scale. It is oriented according to the user's definition of priorities.
Period Index - Period Index is the summation of all the contributors in period configuration parameters. The Period configuration parameters are valued on the scale of 0-10 (best=10 and worst=0).
STEP 1: Convert Input(s) to Base Unit
Minimum Design Index: 16 --> No Conversion Required
Weight Index: 50 --> No Conversion Required
Weight Priority (%): 15.1 --> No Conversion Required
Cost Index: 55 --> No Conversion Required
Cost Priority (%): 10 --> No Conversion Required
Period Index: 95 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Pt = ((DImin*100)-(WI*Pw)-(CI*Pc))/TI --> ((16*100)-(50*15.1)-(55*10))/95
Evaluating ... ...
Pt = 3.10526315789474
STEP 3: Convert Result to Output's Unit
3.10526315789474 --> No Conversion Required
FINAL ANSWER
3.10526315789474 <-- Period Priority (%)
(Calculation completed in 00.000 seconds)

Credits

Created by Vedant Chitte
All India Shri Shivaji Memorials Society's ,College of Engineering (AISSMS COE PUNE), Pune
Vedant Chitte has created this Calculator and 25+ more calculators!
Verified by Anshika Arya
National Institute Of Technology (NIT), Hamirpur
Anshika Arya has verified this Calculator and 2700+ more calculators!

5 Priority Calculators

Summations of priorities of objectives that need to be maximized (Millitary planes)
Go Priority Sum of objectives to be maximized (%) = Performance Priority (%)+Flight Quality Priority (%)+Scariness Priority (%)+Maintainability Priority (%)+Producibility Priority (%)+Disposability Priority (%)+Stealth Priority (%)
Priority of objective weight in design process given minimum design index
Go Weight Priority (%) = ((Minimum Design Index*100)-(Cost Index*Cost Priority (%))-(Period Index*Period Priority (%)))/Weight Index
Priority of objective cost in design process given minimum design index
Go Cost Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Period Index*Period Priority (%)))/Cost Index
Priority of objective period of design given minimum design index
Go Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index
Summation of priorities of all objectives that need to be minimized
Go Priority Sum of objectives to be minimized(%) = Cost Priority (%)+Weight Priority (%)+Period Priority (%)

Priority of objective period of design given minimum design index Formula

Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index
Pt = ((DImin*100)-(WI*Pw)-(CI*Pc))/TI

What is Design Index Concept and How to derive Priority of objective Period of Design from it?

At the start of Conceptual Design, the Designer defines Objective index which depends upon the parameters which influence the respective objective. Sum of all of the parameters contributing the objective factor on scale of 1-10 gives objective index. Now this objective index has its own priorities, in a conceptual design model the priorities are shown in percentage. Now how these factor influence the model is given by the product of the objective index and its priority (taken as a number (conversion from percentage)), it is the share of design index. And if the share of design index is subjected to the Cost, Weight and Design Time only, It is called Minimum Design Index. As they are common factors in all type of Aircrafts. The Priority of Objective Period of Design can be derived from the same as we have to modify the formula.

How to Calculate Priority of objective period of design given minimum design index?

Priority of objective period of design given minimum design index calculator uses Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index to calculate the Period Priority (%), The Priority of objective period of design given minimum design index formula is defined as the minimum design index multiplied by 100 and subtracted by weight and period share whole divided by the period of design index. Period Priority (%) is denoted by Pt symbol.

How to calculate Priority of objective period of design given minimum design index using this online calculator? To use this online calculator for Priority of objective period of design given minimum design index, enter Minimum Design Index (DImin), Weight Index (WI), Weight Priority (%) (Pw), Cost Index (CI), Cost Priority (%) (Pc) & Period Index (TI) and hit the calculate button. Here is how the Priority of objective period of design given minimum design index calculation can be explained with given input values -> 3.105263 = ((16*100)-(50*15.1)-(55*10))/95.

FAQ

What is Priority of objective period of design given minimum design index?
The Priority of objective period of design given minimum design index formula is defined as the minimum design index multiplied by 100 and subtracted by weight and period share whole divided by the period of design index and is represented as Pt = ((DImin*100)-(WI*Pw)-(CI*Pc))/TI or Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index. Minimum Design Index is a comparable quantity in conceptual design phase which considers Cost, Weight and Time period indices, Weight index is the summation of all the contributors in weight configuration parameters. The weight configuration parameters are valued on the scale of 0-10 (best=10 and worst=0), Weight Priority (%) is a factor which shows the priority of Weight factor on a percentage scale. It is oriented according to the user's definition of priorities, Cost index is the summation of all the contributors in cost configuration parameters. The cost configuration parameters are valued on the scale of 0-10 (best=10 and worst=0), Cost Priority (%) is a factor which shows the priority of cost objective on a percentage scale. It is oriented according to the user's definition of priorities & Period Index is the summation of all the contributors in period configuration parameters. The Period configuration parameters are valued on the scale of 0-10 (best=10 and worst=0).
How to calculate Priority of objective period of design given minimum design index?
The Priority of objective period of design given minimum design index formula is defined as the minimum design index multiplied by 100 and subtracted by weight and period share whole divided by the period of design index is calculated using Period Priority (%) = ((Minimum Design Index*100)-(Weight Index*Weight Priority (%))-(Cost Index*Cost Priority (%)))/Period Index. To calculate Priority of objective period of design given minimum design index, you need Minimum Design Index (DImin), Weight Index (WI), Weight Priority (%) (Pw), Cost Index (CI), Cost Priority (%) (Pc) & Period Index (TI). With our tool, you need to enter the respective value for Minimum Design Index, Weight Index, Weight Priority (%), Cost Index, Cost Priority (%) & Period Index and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.