Slack of Event in CPM Solution

STEP 0: Pre-Calculation Summary
Formula Used
Slack of an Event = Total Float-Free Float
S = TF0-FF0
This formula uses 3 Variables
Variables Used
Slack of an Event - (Measured in Second) - Slack of an Event in a network is the difference between the latest event time and the earliest event time at its terminal point or node.
Total Float - (Measured in Second) - Total float is the period by which an activity can shift its timing without affecting the relevant schedule completion date.
Free Float - (Measured in Second) - Free Float is the period by which an activity can shift in its timing without affecting the early start of any succeeding activity or event.
STEP 1: Convert Input(s) to Base Unit
Total Float: 24 Day --> 2073600 Second (Check conversion ​here)
Free Float: 18 Day --> 1555200 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
S = TF0-FF0 --> 2073600-1555200
Evaluating ... ...
S = 518400
STEP 3: Convert Result to Output's Unit
518400 Second -->6 Day (Check conversion ​here)
FINAL ANSWER
6 Day <-- Slack of an Event
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Rachana B V
The National Institute of Engineering (NIE), Mysuru
Rachana B V has created this Calculator and 25+ more calculators!
Verifier Image
Verified by Ayush Singh
Gautam Buddha University (GBU), Greater Noida
Ayush Singh has verified this Calculator and 100+ more calculators!

10+ Critical Path Method Calculators

Earliest Finish Time
​ Go Earliest Finish Time = Latest Finish Time-Total Float
Total Float in CPM
​ Go Total Float = Latest Finish Time-Earliest Finish Time
Latest Finish Time
​ Go Latest Finish Time = Total Float+Earliest Finish Time
Slack of Event given Independent Float
​ Go Slack of an Event = Free Float-Independent Float
Free Float given Indenpendent Float
​ Go Free Float = Independent Float+Slack of an Event
Independent Float used in CPM
​ Go Independent Float = Free Float-Slack of an Event
Total Float given Free Float
​ Go Total Float = Free Float+Slack of an Event
Free Float used in CPM
​ Go Free Float = Total Float-Slack of an Event
Slack of Event in CPM
​ Go Slack of an Event = Total Float-Free Float
Interfering Float
​ Go Interfering Float = Total Float-Free Float

Slack of Event in CPM Formula

Slack of an Event = Total Float-Free Float
S = TF0-FF0

What is Free Float?

Free Float, per definition, is the amount of time that the activity can be delayed before any successors will be delayed. Early Start/Finish times are used to calculate the Free Float values.

What is Slack?

The Slack time for an activity is the time between its earliest and latest start time, or between its earliest and latest finish time. Slack is the amount of time that an activity can be delayed past its earliest start or earliest finish without delaying the project.

How to Calculate Slack of Event in CPM?

Slack of Event in CPM calculator uses Slack of an Event = Total Float-Free Float to calculate the Slack of an Event, The Slack of Event in CPM formula is defined as the time an event/task can be delayed without delaying the project's completion. Slack of an Event is denoted by S symbol.

How to calculate Slack of Event in CPM using this online calculator? To use this online calculator for Slack of Event in CPM, enter Total Float (TF0) & Free Float (FF0) and hit the calculate button. Here is how the Slack of Event in CPM calculation can be explained with given input values -> 6.9E-5 = 2073600-1555200.

FAQ

What is Slack of Event in CPM?
The Slack of Event in CPM formula is defined as the time an event/task can be delayed without delaying the project's completion and is represented as S = TF0-FF0 or Slack of an Event = Total Float-Free Float. Total float is the period by which an activity can shift its timing without affecting the relevant schedule completion date & Free Float is the period by which an activity can shift in its timing without affecting the early start of any succeeding activity or event.
How to calculate Slack of Event in CPM?
The Slack of Event in CPM formula is defined as the time an event/task can be delayed without delaying the project's completion is calculated using Slack of an Event = Total Float-Free Float. To calculate Slack of Event in CPM, you need Total Float (TF0) & Free Float (FF0). With our tool, you need to enter the respective value for Total Float & Free Float and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Slack of an Event?
In this formula, Slack of an Event uses Total Float & Free Float. We can use 1 other way(s) to calculate the same, which is/are as follows -