How to Calculate Basic setup time given Non-productive time in turning?
Basic setup time given Non-productive time in turning calculator uses Basic Setup Time = (Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time per Tool) to calculate the Basic Setup Time, The Basic setup time given Non-productive time in turning is the basic time required to load/unload the workpiece and position the tool for production for one component. Basic Setup Time is denoted by tsa symbol.
How to calculate Basic setup time given Non-productive time in turning using this online calculator? To use this online calculator for Basic setup time given Non-productive time in turning, enter Non-Productive Time (NPT), Loading and Unloading Time (tln), Tool Positioning Time per Operation (tpt), Number of Operations (n0), Batch Size (Nb), Number of Tools Used (Nt) & Setup Time per Tool (tsb) and hit the calculate button. Here is how the Basic setup time given Non-productive time in turning calculation can be explained with given input values -> 0.341667 = (1200-30-(90*4))*3-(2*600).