9 Other formulas that you can solve using the same Inputs

Ratio of Pay to Loose when Compaction Production by Compaction Equipment is Given
Ratio of pay=(Compaction production *Number of passes)/(16*Width of roller*Roller speed*Lift thickness*Efficiency factor ) GO
Thickness of lift when Compaction Production by Compaction Equipment is Given
Lift thickness=(Compaction production *Number of passes)/(16*Width of roller*Roller speed*Efficiency factor *Roller speed) GO
Width of Roller when Compaction Production by Compaction Equipment is Given
Width of roller=(Compaction production *Number of passes)/(16*Roller speed*Lift thickness*Ratio of pay*Efficiency factor ) GO
Speed of Roller when Compaction Production by Compaction Equipment is Given
Roller speed=(Compaction production *Number of passes)/(16*Width of roller*Lift thickness*Ratio of pay*Efficiency factor ) GO
Number of Passes when Compaction Production by Compaction Equipment is Given
Number of passes=(16*Width of roller*Roller speed*Efficiency factor *Lift thickness*Ratio of pay)/Compaction production GO
Compaction Production by Compaction Equipment
Compaction production =(16*Width of roller*Roller speed*Lift thickness*Efficiency factor *Ratio of pay)/Number of passes GO
Compaction Production by Compaction Equipment when Efficiency Factor is Excellent
Compaction production =(16*Width of roller*Roller speed*Lift thickness*Ratio of pay*0.90)/Number of passes GO
Compaction Production by Compaction Equipment when Efficiency Factor is Average
Compaction production =(16*Width of roller*Roller speed*Lift thickness*Ratio of pay*0.80)/Number of passes GO
Compaction Production by Compaction Equipment when Efficiency Factor is Poor
Compaction production =(16*Width of roller*Roller speed*Lift thickness*Ratio of pay*0.75)/Number of passes GO

Efficiency Factor when Compaction Production by Compaction Equipment is Given Formula

Efficiency factor =(Compaction production *Number of passes)/(16*Width of roller*Roller speed*Lift thickness*Ratio of pay)
E=(C*P)/(16*W*S*L*F)
More formulas
Compaction Production by Compaction Equipment GO
Width of Roller when Compaction Production by Compaction Equipment is Given GO
Speed of Roller when Compaction Production by Compaction Equipment is Given GO
Thickness of lift when Compaction Production by Compaction Equipment is Given GO
Ratio of Pay to Loose when Compaction Production by Compaction Equipment is Given GO
Number of Passes when Compaction Production by Compaction Equipment is Given GO
Compaction Production by Compaction Equipment when Efficiency Factor is Excellent GO
Compaction Production by Compaction Equipment when Efficiency Factor is Average GO
Compaction Production by Compaction Equipment when Efficiency Factor is Poor GO

What is efficiency factor ?

The efficiency factor is the relationship between the allowance time and the time taken, in the form of percentage.The efficiency factor is an extremely simple to use and readily comprehensible index, the prerequisite being exact time management for maintaining the allowed times.

How to Calculate Efficiency Factor when Compaction Production by Compaction Equipment is Given?

Efficiency Factor when Compaction Production by Compaction Equipment is Given calculator uses Efficiency factor =(Compaction production *Number of passes)/(16*Width of roller*Roller speed*Lift thickness*Ratio of pay) to calculate the Efficiency factor , The Efficiency Factor when Compaction Production by Compaction Equipment is Given is defined as the relationship between the allowance time and the time taken, in the form of percentage. Efficiency factor and is denoted by E symbol.

How to calculate Efficiency Factor when Compaction Production by Compaction Equipment is Given using this online calculator? To use this online calculator for Efficiency Factor when Compaction Production by Compaction Equipment is Given, enter Compaction production (C), Number of passes (P), Width of roller (W), Roller speed (S), Lift thickness (L) and Ratio of pay (F) and hit the calculate button. Here is how the Efficiency Factor when Compaction Production by Compaction Equipment is Given calculation can be explained with given input values -> 0.028935 = (0.00138888888888889*5)/(16*3*0.833333333333333*0.002*3).

FAQ

What is Efficiency Factor when Compaction Production by Compaction Equipment is Given?
The Efficiency Factor when Compaction Production by Compaction Equipment is Given is defined as the relationship between the allowance time and the time taken, in the form of percentage and is represented as E=(C*P)/(16*W*S*L*F) or Efficiency factor =(Compaction production *Number of passes)/(16*Width of roller*Roller speed*Lift thickness*Ratio of pay). Compaction production is the exertion of force on something so that it becomes more dense, Number of passes required to obtain the required compaction depends on the lift thickness, contact pressure, and soil moisture content. , Width of roller is the smaller dimension of the roller , Roller speed is the speed by which roller is rolling over surface, Lift thickness governs aggregate size and Ratio of pay to loose in soil compaction.
How to calculate Efficiency Factor when Compaction Production by Compaction Equipment is Given?
The Efficiency Factor when Compaction Production by Compaction Equipment is Given is defined as the relationship between the allowance time and the time taken, in the form of percentage is calculated using Efficiency factor =(Compaction production *Number of passes)/(16*Width of roller*Roller speed*Lift thickness*Ratio of pay). To calculate Efficiency Factor when Compaction Production by Compaction Equipment is Given, you need Compaction production (C), Number of passes (P), Width of roller (W), Roller speed (S), Lift thickness (L) and Ratio of pay (F). With our tool, you need to enter the respective value for Compaction production , Number of passes, Width of roller, Roller speed, Lift thickness and Ratio of pay and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.