Equivalent Digested Sludge Produced Per Day given Digestion Period Solution

STEP 0: Pre-Calculation Summary
Formula Used
Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days)
V2 = (V-((V1*t)/2))/((0.5*t)+T)
This formula uses 5 Variables
Variables Used
Equivalent digested sludge - (Measured in Cubic Meter per Second) - Equivalent digested sludge is the volume of sludge produced per day.
Volume of digester - (Measured in Cubic Meter) - Volume of digester is defined as the total capacity of the digester.
Raw sludge - (Measured in Cubic Meter per Second) - Raw sludge is defined as the volume of raw sludge added per day .
Digestion period - (Measured in Second) - Digestion period is the time required to complete the digestion.
Time in Days - (Measured in Second) - Time in days is the time calculated in days.
STEP 1: Convert Input(s) to Base Unit
Volume of digester: 20 Cubic Meter --> 20 Cubic Meter No Conversion Required
Raw sludge: 2 Cubic Meter per Day --> 2.31481481481481E-05 Cubic Meter per Second (Check conversion here)
Digestion period: 5 Second --> 5 Second No Conversion Required
Time in Days: 10 Day --> 864000 Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
V2 = (V-((V1*t)/2))/((0.5*t)+T) --> (20-((2.31481481481481E-05*5)/2))/((0.5*5)+864000)
Evaluating ... ...
V2 = 2.31480141893451E-05
STEP 3: Convert Result to Output's Unit
2.31480141893451E-05 Cubic Meter per Second -->1.99998842595942 Cubic Meter per Day (Check conversion here)
FINAL ANSWER
1.99998842595942 1.999988 Cubic Meter per Day <-- Equivalent digested sludge
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

8 Sludge Digestion Tank or Digesters Calculators

Volume of Digester given Number of Days for which Digested Sludge is Stored
Go Volume of digester = (((Raw sludge+Equivalent digested sludge)/2)*Digestion period)+(Equivalent digested sludge*Time in Days)
Number of Days for which Digested Sludge is Stored
Go Time in Days = (Volume of digester-(((Raw sludge+Equivalent digested sludge)/2)*Digestion period))/Equivalent digested sludge
Equivalent Digested Sludge Produced Per Day given Digestion Period
Go Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days)
Volume of Digester when Digestion is Parabolic
Go Volume of digester = (Raw sludge-((2*(Raw sludge-Equivalent digested sludge))/3))*Digestion period
Raw Sludge Added Per Day given Digestion is Parabolic
Go Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge)
Volume of Digester
Go Volume of digester = ((Raw sludge+Equivalent digested sludge)/2)*Digestion period
Equivalent Digested Sludge Produced Per Day given Raw Sludge Added Per Day
Go Equivalent digested sludge = Raw sludge/3
Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day
Go Raw sludge = 3*Equivalent digested sludge

Equivalent Digested Sludge Produced Per Day given Digestion Period Formula

Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days)
V2 = (V-((V1*t)/2))/((0.5*t)+T)

What is sludge ?

Sludge is a semi-solid slurry that can be produced from a range of industrial processes, from water treatment, wastewater treatment or on-site sanitation systems.

How to Calculate Equivalent Digested Sludge Produced Per Day given Digestion Period?

Equivalent Digested Sludge Produced Per Day given Digestion Period calculator uses Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days) to calculate the Equivalent digested sludge, Equivalent Digested Sludge Produced Per Day given Digestion Period calculates equivalent digested sludge when we have prior information of other parameters used. Equivalent digested sludge is denoted by V2 symbol.

How to calculate Equivalent Digested Sludge Produced Per Day given Digestion Period using this online calculator? To use this online calculator for Equivalent Digested Sludge Produced Per Day given Digestion Period, enter Volume of digester (V), Raw sludge (V1), Digestion period (t) & Time in Days (T) and hit the calculate button. Here is how the Equivalent Digested Sludge Produced Per Day given Digestion Period calculation can be explained with given input values -> 172799 = (20-((2.31481481481481E-05*5)/2))/((0.5*5)+864000).

FAQ

What is Equivalent Digested Sludge Produced Per Day given Digestion Period?
Equivalent Digested Sludge Produced Per Day given Digestion Period calculates equivalent digested sludge when we have prior information of other parameters used and is represented as V2 = (V-((V1*t)/2))/((0.5*t)+T) or Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days). Volume of digester is defined as the total capacity of the digester, Raw sludge is defined as the volume of raw sludge added per day , Digestion period is the time required to complete the digestion & Time in days is the time calculated in days.
How to calculate Equivalent Digested Sludge Produced Per Day given Digestion Period?
Equivalent Digested Sludge Produced Per Day given Digestion Period calculates equivalent digested sludge when we have prior information of other parameters used is calculated using Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days). To calculate Equivalent Digested Sludge Produced Per Day given Digestion Period, you need Volume of digester (V), Raw sludge (V1), Digestion period (t) & Time in Days (T). With our tool, you need to enter the respective value for Volume of digester, Raw sludge, Digestion period & Time in Days and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Equivalent digested sludge?
In this formula, Equivalent digested sludge uses Volume of digester, Raw sludge, Digestion period & Time in Days. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Equivalent digested sludge = Raw sludge/3