Least Allowable Occurrence Time of Event j Solution

STEP 0: Pre-Calculation Summary
Formula Used
least_time_j = LOT of event i+Duration of i-j
TLj = TLi+tij
This formula uses 2 Variables
Variables Used
LOT of event i - LOT of event i gives the least allowable occurrence of time. (Measured in Day)
Duration of i-j - Duration of i-j is the expected time of activity i-j (Measured in Day)
STEP 1: Convert Input(s) to Base Unit
LOT of event i: 20 Day --> 1728000 Second (Check conversion here)
Duration of i-j: 200 Day --> 17280000 Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
TLj = TLi+tij --> 1728000+17280000
Evaluating ... ...
TLj = 19008000
STEP 3: Convert Result to Output's Unit
19008000 Second -->220 Day (Check conversion here)
FINAL ANSWER
220 Day <-- LOT of event j
(Calculation completed in 00.016 seconds)

3 Other formulas that you can solve using the same Inputs

Earliest Expected Occurrence Time of Event j
earliest_occurence_j = EOT of i+Duration of i-j Go
Earliest Expected Occurrence Time of Event i
earliest_occurence_i = EOT of j-Duration of i-j Go
Least Allowable Occurrence Time of Event i
least_time_i = LOT of event j-Duration of i-j Go

Least Allowable Occurrence Time of Event j Formula

least_time_j = LOT of event i+Duration of i-j
TLj = TLi+tij

What is an Event and an Activity?

An event represents the accomplishment of some task. In a network diagram, beginning and ending of an activity are represented as events. Each event is represented as a node in a network diagram. An event does not consume any time or resource. Each network diagram starts with an initial event and ends at a terminal event. An activity is a physically identifiable part of a project, which consumes both time and resources. Activity is represented by an arrow in a network diagram. The head of an arrow represents the start of activity and the tail of arrow represents its end. Activity description and its estimated completion time are written along the arrow.

How to Calculate Least Allowable Occurrence Time of Event j?

Least Allowable Occurrence Time of Event j calculator uses least_time_j = LOT of event i+Duration of i-j to calculate the LOT of event j, The Least Allowable Occurrence Time of Event j defines the least time at which the event j must occur to keep the project on schedule. LOT of event j and is denoted by TLj symbol.

How to calculate Least Allowable Occurrence Time of Event j using this online calculator? To use this online calculator for Least Allowable Occurrence Time of Event j, enter LOT of event i (TLi) and Duration of i-j (tij) and hit the calculate button. Here is how the Least Allowable Occurrence Time of Event j calculation can be explained with given input values -> 220 = 1728000+17280000.

FAQ

What is Least Allowable Occurrence Time of Event j?
The Least Allowable Occurrence Time of Event j defines the least time at which the event j must occur to keep the project on schedule and is represented as TLj = TLi+tij or least_time_j = LOT of event i+Duration of i-j. LOT of event i gives the least allowable occurrence of time and Duration of i-j is the expected time of activity i-j.
How to calculate Least Allowable Occurrence Time of Event j?
The Least Allowable Occurrence Time of Event j defines the least time at which the event j must occur to keep the project on schedule is calculated using least_time_j = LOT of event i+Duration of i-j. To calculate Least Allowable Occurrence Time of Event j, you need LOT of event i (TLi) and Duration of i-j (tij). With our tool, you need to enter the respective value for LOT of event i and Duration of i-j and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.