Maximum Demand given Load Factor Solution

STEP 0: Pre-Calculation Summary
Formula Used
Maximum Demand = Average Load/Load Factor
Max Demand = Avg Load/Load Factor
This formula uses 3 Variables
Variables Used
Maximum Demand - (Measured in Watt) - Maximum Demand is defined as the peak power consumption of the load connected.
Average Load - (Measured in Watt) - Average Load is the average load occurring on the power station in a given period known as an average load.
Load Factor - Load Factor is the ratio of average load to the maximum demand during a given period.
STEP 1: Convert Input(s) to Base Unit
Average Load: 1105 Kilowatt --> 1105000 Watt (Check conversion ​here)
Load Factor: 0.65 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Max Demand = Avg Load/Load Factor --> 1105000/0.65
Evaluating ... ...
Max Demand = 1700000
STEP 3: Convert Result to Output's Unit
1700000 Watt -->1700 Kilowatt (Check conversion ​here)
FINAL ANSWER
1700 Kilowatt <-- Maximum Demand
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Prahalad Singh
Jaipur Engineering College and Research Centre (JECRC), Jaipur
Prahalad Singh has created this Calculator and 100+ more calculators!
Verifier Image
Verified by Payal Priya
Birsa Institute of Technology (BIT), Sindri
Payal Priya has verified this Calculator and 1900+ more calculators!

15 Power Plant Operational Factors Calculators

Wind Power
​ Go Wind Power = 0.5*Plant Efficiency*Air Density*Blade Area*Wind Speed^3
Utilisation Factor of Plant
​ Go Utilisation Factor = Maximum Demand/Plant Capacity
Unit Generated per Annum
​ Go Units Generated = Maximum Demand*Load Factor*8760
Diversity Factor
​ Go Diversity Factor = Combined Demand/Maximum Demand
Plant Use Factor
​ Go Plant Use Factor = Maximum Demand/Plant Capacity
Reserve Capacity
​ Go Reserve Capacity = Plant Capacity-Maximum Demand
Plant Capacity Factor
​ Go Capacity Factor = Average Demand/Plant Capacity
Maximum Demand using Demand Factor
​ Go Maximum Demand = Demand Factor*Connected Load
Demand Factor
​ Go Demand Factor = Maximum Demand/Connected Load
Operation Factor
​ Go Operation Factor = Working Time/Total Time
Load Factor given Average Load and Maximum Demand
​ Go Load Factor = Average Load/Maximum Demand
Maximum Demand given Load Factor
​ Go Maximum Demand = Average Load/Load Factor
Average Load
​ Go Average Load = Maximum Demand*Load Factor
Coincidence Factor
​ Go Coincidence Factor = 1/Diversity Factor
Average Load for Load Curve
​ Go Average Load = Load Curve Area/24

Maximum Demand given Load Factor Formula

Maximum Demand = Average Load/Load Factor
Max Demand = Avg Load/Load Factor

What is the condition for the Load Factor?

Practically the value for the Load Factor is less than 1. A high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load factor.

How to Calculate Maximum Demand given Load Factor?

Maximum Demand given Load Factor calculator uses Maximum Demand = Average Load/Load Factor to calculate the Maximum Demand, Maximum Demand given Load Factor is defined as the maximum raise in demand. It is generally measured in MW. Maximum Demand is denoted by Max Demand symbol.

How to calculate Maximum Demand given Load Factor using this online calculator? To use this online calculator for Maximum Demand given Load Factor, enter Average Load (Avg Load) & Load Factor (Load Factor) and hit the calculate button. Here is how the Maximum Demand given Load Factor calculation can be explained with given input values -> 1.7 = 1105000/0.65.

FAQ

What is Maximum Demand given Load Factor?
Maximum Demand given Load Factor is defined as the maximum raise in demand. It is generally measured in MW and is represented as Max Demand = Avg Load/Load Factor or Maximum Demand = Average Load/Load Factor. Average Load is the average load occurring on the power station in a given period known as an average load & Load Factor is the ratio of average load to the maximum demand during a given period.
How to calculate Maximum Demand given Load Factor?
Maximum Demand given Load Factor is defined as the maximum raise in demand. It is generally measured in MW is calculated using Maximum Demand = Average Load/Load Factor. To calculate Maximum Demand given Load Factor, you need Average Load (Avg Load) & Load Factor (Load Factor). With our tool, you need to enter the respective value for Average Load & Load Factor and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Maximum Demand?
In this formula, Maximum Demand uses Average Load & Load Factor. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Maximum Demand = Demand Factor*Connected Load