Loaded Volume of Soil given Original Volume of Soil Solution

STEP 0: Pre-Calculation Summary
Formula Used
Loaded Volume = (Original volume of Soil/Load Factor)
VL = (VO/LF)
This formula uses 3 Variables
Variables Used
Loaded Volume - (Measured in Cubic Meter) - Loaded Volume is the volume of soil after excavation.
Original volume of Soil - (Measured in Cubic Meter) - Original volume of Soil is the volume of soil before excavation.
Load Factor - Load Factor is the ratio of average load to the maximum demand during a given period.
STEP 1: Convert Input(s) to Base Unit
Original volume of Soil: 22 Cubic Meter --> 22 Cubic Meter No Conversion Required
Load Factor: 0.1 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
VL = (VO/LF) --> (22/0.1)
Evaluating ... ...
VL = 220
STEP 3: Convert Result to Output's Unit
220 Cubic Meter --> No Conversion Required
FINAL ANSWER
220 Cubic Meter <-- Loaded Volume
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

9 Earth Quantities Hauled Calculators

Original Volume of Soil before Excavation given Percent Swell
Go Original volume of Soil = (100/(100+0.01*Swell in Soil))*Loaded Volume
Loaded Volume of Soil given Percent Swell
Go Loaded Volume = (Original volume of Soil*(100+0.01*Swell in Soil)/100)
Swell in Soil given Original Volume of Soil
Go Swell in Soil = 10000*((Loaded Volume/Original volume of Soil)-1)
Compacted Volume of Soil after Excavation of Soil
Go Compacted Volume = (Original volume of Soil*Shrinkage Factor)
Shrinkage Factor using Compacted Volume of Soil
Go Shrinkage Factor = (Compacted Volume/Original volume of Soil)
Original Volume of Soil given Compacted Volume
Go Original volume of Soil = (Compacted Volume/Shrinkage Factor)
Loaded Volume of Soil given Original Volume of Soil
Go Loaded Volume = (Original volume of Soil/Load Factor)
Load Factor given Original Volume of Soil
Go Load Factor = (Original volume of Soil/Loaded Volume)
Original Volume of Soil before Excavation
Go Original volume of Soil = Loaded Volume*Load Factor

Loaded Volume of Soil given Original Volume of Soil Formula

Loaded Volume = (Original volume of Soil/Load Factor)
VL = (VO/LF)

What is Volume of Soil?

The total soil volume is the combined volume of solids and pores which may contain air (Vair) or water (Vwater), or both.The average values of air, water and solid in soil are easily measured and are a useful indication of a soils physical condition.

How to Calculate Loaded Volume of Soil given Original Volume of Soil?

Loaded Volume of Soil given Original Volume of Soil calculator uses Loaded Volume = (Original volume of Soil/Load Factor) to calculate the Loaded Volume, The Loaded Volume of Soil given Original Volume of Soil is defined as the volume of soil which is loaded on vehicle after excavation. Loaded Volume is denoted by VL symbol.

How to calculate Loaded Volume of Soil given Original Volume of Soil using this online calculator? To use this online calculator for Loaded Volume of Soil given Original Volume of Soil, enter Original volume of Soil (VO) & Load Factor (LF) and hit the calculate button. Here is how the Loaded Volume of Soil given Original Volume of Soil calculation can be explained with given input values -> 200 = (22/0.1).

FAQ

What is Loaded Volume of Soil given Original Volume of Soil?
The Loaded Volume of Soil given Original Volume of Soil is defined as the volume of soil which is loaded on vehicle after excavation and is represented as VL = (VO/LF) or Loaded Volume = (Original volume of Soil/Load Factor). Original volume of Soil is the volume of soil before excavation & Load Factor is the ratio of average load to the maximum demand during a given period.
How to calculate Loaded Volume of Soil given Original Volume of Soil?
The Loaded Volume of Soil given Original Volume of Soil is defined as the volume of soil which is loaded on vehicle after excavation is calculated using Loaded Volume = (Original volume of Soil/Load Factor). To calculate Loaded Volume of Soil given Original Volume of Soil, you need Original volume of Soil (VO) & Load Factor (LF). With our tool, you need to enter the respective value for Original volume of Soil & Load Factor and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Loaded Volume?
In this formula, Loaded Volume uses Original volume of Soil & Load Factor. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Loaded Volume = (Original volume of Soil*(100+0.01*Swell in Soil)/100)