How to Calculate Loading and unloading time given Non-productive time in turning?
Loading and unloading time given Non-productive time in turning calculator uses Loading and Unloading Time = Non-Productive Time-((Basic Setup Time+Number of Tools Used*Setup Time per Tool)/Batch Size)-(Tool Positioning Time per Operation*Number of Operations) to calculate the Loading and Unloading Time, The Loading and unloading time given Non-productive time in turning is the time required to load/unload the workpiece before the start of machine operation. Loading and Unloading Time is denoted by tln symbol.
How to calculate Loading and unloading time given Non-productive time in turning using this online calculator? To use this online calculator for Loading and unloading time given Non-productive time in turning, enter Non-Productive Time (NPT), Basic Setup Time (tsa), Number of Tools Used (Nt), Setup Time per Tool (tsb), Batch Size (Nb), Tool Positioning Time per Operation (tpt) & Number of Operations (n0) and hit the calculate button. Here is how the Loading and unloading time given Non-productive time in turning calculation can be explained with given input values -> 0.008333 = 1200-((1230+2*600)/3)-(90*4).