Number of Days after Peak given Area in sq miles Solution

STEP 0: Pre-Calculation Summary
Formula Used
Number of Days = (Area of Basin)^(0.2)
NDays = (A1)^(0.2)
This formula uses 2 Variables
Variables Used
Number of Days - The Number of Days means the number of days after the peak is achieved.
Area of Basin - (Measured in Square Meter) - Area of Basin which is also known as catchment area.
STEP 1: Convert Input(s) to Base Unit
Area of Basin: 2 Square Mile --> 5179976.220672 Square Meter (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
NDays = (A1)^(0.2) --> (5179976.220672)^(0.2)
Evaluating ... ...
NDays = 22.0224459727612
STEP 3: Convert Result to Output's Unit
22.0224459727612 --> No Conversion Required
FINAL ANSWER
22.0224459727612 22.02245 <-- Number of Days
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

8 Hydrograph Analysis Calculators

Time Interval between Successive Ordinates given Direct Runoff depth
Go Time Interval = (Catchment Area*Surface Runoff)/(0.36*Sum of Ordinates)
Sum of Ordinates of Direct Runoff given Direct Runoff depth
Go Sum of Ordinates = (Catchment Area*Surface Runoff)/(0.36*Time Interval)
Direct Runoff depth given Sum of Ordinates
Go Surface Runoff = 0.36*((Sum of Ordinates*Time Interval)/Catchment Area)
Catchment Area given Direct Runoff Depth
Go Catchment Area = (0.36*Sum of Ordinates*Time Interval)/Surface Runoff
Catchment Area in sq km given Number of Days after Peak
Go Catchment Area = (Number of Days/0.84)^(1/0.2)
Number of Days after Peak given Area in sq km
Go Number of Days = 0.84*(Catchment Area)^(0.2)
Catchment Area in sq miles given Number of Days after Peak
Go Catchment Area = (Number of Days)^(1/0.2)
Number of Days after Peak given Area in sq miles
Go Number of Days = (Area of Basin)^(0.2)

Number of Days after Peak given Area in sq miles Formula

Number of Days = (Area of Basin)^(0.2)
NDays = (A1)^(0.2)

What is Runoff ?

Runoff occurs when there is more water than land can absorb. The excess liquid flows across the surface of the land and into nearby creeks, streams, or ponds.

How to Calculate Number of Days after Peak given Area in sq miles?

Number of Days after Peak given Area in sq miles calculator uses Number of Days = (Area of Basin)^(0.2) to calculate the Number of Days, The Number of Days after Peak given Area in sq miles is defined as the value of number of days after peak when we have prior information of other parameters used. Number of Days is denoted by NDays symbol.

How to calculate Number of Days after Peak given Area in sq miles using this online calculator? To use this online calculator for Number of Days after Peak given Area in sq miles, enter Area of Basin (A1) and hit the calculate button. Here is how the Number of Days after Peak given Area in sq miles calculation can be explained with given input values -> 22.02245 = (5179976.220672)^(0.2).

FAQ

What is Number of Days after Peak given Area in sq miles?
The Number of Days after Peak given Area in sq miles is defined as the value of number of days after peak when we have prior information of other parameters used and is represented as NDays = (A1)^(0.2) or Number of Days = (Area of Basin)^(0.2). Area of Basin which is also known as catchment area.
How to calculate Number of Days after Peak given Area in sq miles?
The Number of Days after Peak given Area in sq miles is defined as the value of number of days after peak when we have prior information of other parameters used is calculated using Number of Days = (Area of Basin)^(0.2). To calculate Number of Days after Peak given Area in sq miles, you need Area of Basin (A1). With our tool, you need to enter the respective value for Area of Basin and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Number of Days?
In this formula, Number of Days uses Area of Basin. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Number of Days = 0.84*(Catchment Area)^(0.2)
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!