Overall Equipment Effectiveness Solution

STEP 0: Pre-Calculation Summary
Formula Used
Overall Equipment Effectiveness = Good Count*Ideal Cycle Time/Planned Production Time
OEE = GC*ICT/PPT
This formula uses 4 Variables
Variables Used
Overall Equipment Effectiveness - Overall Equipment Effectiveness is a performance metric used in manufacturing to evaluate the efficiency and productivity of equipment or machinery.
Good Count - Good Count refers to the total number of products or items that meet the specified quality standards and are deemed acceptable for sale or use.
Ideal Cycle Time - Ideal Cycle Time represents the theoretical minimum time required to produce one unit of a product under optimal conditions.
Planned Production Time - Planned Production Time refers to the total amount of time scheduled or allocated for production activities within a specific period.
STEP 1: Convert Input(s) to Base Unit
Good Count: 6560 --> No Conversion Required
Ideal Cycle Time: 5 --> No Conversion Required
Planned Production Time: 10 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
OEE = GC*ICT/PPT --> 6560*5/10
Evaluating ... ...
OEE = 3280
STEP 3: Convert Result to Output's Unit
3280 --> No Conversion Required
FINAL ANSWER
3280 <-- Overall Equipment Effectiveness
(Calculation completed in 00.020 seconds)

Credits

Creator Image
Created by Aashna
IGNOU (IGNOU), India
Aashna has created this Calculator and 50+ more calculators!
Verifier Image
Verified by Surjojoti Som
Rashtreeya Vidyalaya College of Engineering (RVCE), Bangalore
Surjojoti Som has verified this Calculator and 0 more calculators!

25 Cost Accounting Calculators

Material Cost Variance
​ Go Material Cost Variance = (Standard Quality for Actual Output*Standard Price)-(Actual Quantity*Actual Price)
Labour Cost Variance
​ Go Labour Cost Variance = (Standard Hours for Actual Output*Standard Rate)-(Actual Hours*Actual Rate)
Revised Standard Quantity
​ Go Revised Standard Quantity = (Standard Quantity of each Material/Total Standard Quantity)*Total Actual Quantity
Learning Curve
​ Go Learning Curve = (Time Taken to Produce Initial Quantity*Cumulative Number of Batches)^(-Learning Coefficient)
Labour Efficiency Variance
​ Go Labour Efficiency Variance = Standard Rate*(Standard Time-Actual Time)*Variance
Time to Receive
​ Go Time to Receive = Time for Stock Validation+Time to Add Stock to Records+Time to Prep Stock for Storage
Labour Rate Variance
​ Go Labour Rate Variance = Actual Time*(Standard Rate-Actual Rate)*Variance
Cycle Time
​ Go Cycle Time = Process Time+Inspection Time+Move Time+Queue Time
Revised Standard Hours of Labours
​ Go Revised Standard Hours of Labours = (Actual Mix/Standard Mix)*(Standard Hours of Labour)
Material Yield Variance
​ Go Material Yield Variance = (Actual Unit Usage-Standard Unit Usage)*Standard Cost per Unit
Overall Equipment Effectiveness
​ Go Overall Equipment Effectiveness = Good Count*Ideal Cycle Time/Planned Production Time
Avoided Cost
​ Go Avoided Costs = Assumed Repair Cost+Production Losses-Preventative Maintenance Cost
Material Usage Variance
​ Go Material Usage Variance = Standard Price*(Actual Quantity Units-Standard Quantity)
Labour Mix Variance
​ Go Labour Mix Variance = Standard Rate*(Reversed Standard Rate-Actual Time)
Material Price Variance
​ Go Material Price Variance = Actual Quantity*(Standard Price-Actual Price)
Material Quantity
​ Go Material Quantity = Standard Price*(Standard Quantity-Actual Quantity)
Customer Acquisition Cost
​ Go Customer Acquisition Cost = Cost of Sales and Marketing/Number of New Customers Acquired
Total Addressable Market
​ Go Total Addressable Market = Annual Contract Value per Client*Number of Potential Clients
First Pass Yield
​ Go First Pass Yield = Number of Good Products Finished/Number of Production Orders Started
Average Days Delinquent
​ Go Average Days Delinquent = Days Sales Outstanding-Best Possible Days Sales Outstanding
Backorder Rate
​ Go Backorder Rate = (Number of Undeliverable Orders/Total Number of Orders)
Monthly Recurring Revenue
​ Go Monthly Recurring Revenue = Number of Customers*Average Billed Amount
Sell -Through Rate
​ Go Sell Through Rate = Number of Units Sold/Number of Units Received
Takt Time
​ Go Takt Time = Production Available Time/Customer Demand
On-Time Delivery
​ Go On-Time Delivery = On Time Units/Total Units

Overall Equipment Effectiveness Formula

Overall Equipment Effectiveness = Good Count*Ideal Cycle Time/Planned Production Time
OEE = GC*ICT/PPT

What is Overall Equipment Effectiveness ?

Overall Equipment Effectiveness is a metric that identifies the percentage of planned production time that is truly productive. Overall equipment effectiveness is a measure of how well a manufacturing operation is utilized (facilities, time, and material) compared to its full. It provides insights into how well equipment is performing relative to its maximum potential. It is typically calculated as the product of three key factors ie. availability, performance, and quality. Each factor is expressed as a percentage, and when multiplied together, they give the overall equipment effectiveness percentage.

How to Calculate Overall Equipment Effectiveness?

Overall Equipment Effectiveness calculator uses Overall Equipment Effectiveness = Good Count*Ideal Cycle Time/Planned Production Time to calculate the Overall Equipment Effectiveness, Overall Equipment Effectiveness is a key performance metric used in manufacturing and production industries to assess the efficiency and productivity of equipment or machinery. Overall Equipment Effectiveness is denoted by OEE symbol.

How to calculate Overall Equipment Effectiveness using this online calculator? To use this online calculator for Overall Equipment Effectiveness, enter Good Count (GC), Ideal Cycle Time (ICT) & Planned Production Time (PPT) and hit the calculate button. Here is how the Overall Equipment Effectiveness calculation can be explained with given input values -> 3280 = 6560*5/10.

FAQ

What is Overall Equipment Effectiveness?
Overall Equipment Effectiveness is a key performance metric used in manufacturing and production industries to assess the efficiency and productivity of equipment or machinery and is represented as OEE = GC*ICT/PPT or Overall Equipment Effectiveness = Good Count*Ideal Cycle Time/Planned Production Time. Good Count refers to the total number of products or items that meet the specified quality standards and are deemed acceptable for sale or use, Ideal Cycle Time represents the theoretical minimum time required to produce one unit of a product under optimal conditions & Planned Production Time refers to the total amount of time scheduled or allocated for production activities within a specific period.
How to calculate Overall Equipment Effectiveness?
Overall Equipment Effectiveness is a key performance metric used in manufacturing and production industries to assess the efficiency and productivity of equipment or machinery is calculated using Overall Equipment Effectiveness = Good Count*Ideal Cycle Time/Planned Production Time. To calculate Overall Equipment Effectiveness, you need Good Count (GC), Ideal Cycle Time (ICT) & Planned Production Time (PPT). With our tool, you need to enter the respective value for Good Count, Ideal Cycle Time & Planned Production Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.