Peak Load given Load Factor for Turbo-Generators Solution

STEP 0: Pre-Calculation Summary
Formula Used
Peak Load = Average Load/Load Factor
PL = LAvg/LF
This formula uses 3 Variables
Variables Used
Peak Load - (Measured in Watt) - Peak Load is the maximum load on an electrical power-supply system.
Average Load - (Measured in Watt) - Average Load is the average load occurring on the power station in a given period known as an average load.
Load Factor - Load Factor is the ratio of average load to the maximum demand during a given period.
STEP 1: Convert Input(s) to Base Unit
Average Load: 400 Watt --> 400 Watt No Conversion Required
Load Factor: 0.1 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
PL = LAvg/LF --> 400/0.1
Evaluating ... ...
PL = 4000
STEP 3: Convert Result to Output's Unit
4000 Watt -->4 Kilowatt (Check conversion ​here)
FINAL ANSWER
4 Kilowatt <-- Peak Load
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by M Naveen
National Institute of Technology (NIT), Warangal
M Naveen has created this Calculator and 500+ more calculators!
Verifier Image
Verified by Chandana P Dev
NSS College of Engineering (NSSCE), Palakkad
Chandana P Dev has verified this Calculator and 1700+ more calculators!

9 Water Power Engineering Calculators

Total Power that can be Developed given Utilization Factor
​ Go Total Power that can be Developed = Max Power Developed/Utilization Factor
Maximum Power Developed given Utilization Factor
​ Go Max Power Developed = Utilization Factor*Total Power that can be Developed
Utilization Factor
​ Go Utilization Factor = Max Power Developed/Total Power that can be Developed
Energy Actually Produced given Plant Factor
​ Go Energy Actually Produced = Plant Factor*Max Energy Produced
Maximum Energy Produced using Plant Factor
​ Go Max Energy Produced = Energy Actually Produced/Plant Factor
Plant Factor
​ Go Plant Factor = Energy Actually Produced/Max Energy Produced
Average Load given Load Factor for Turbo-generators
​ Go Average Load = Load Factor*Peak Load
Peak Load given Load Factor for Turbo-Generators
​ Go Peak Load = Average Load/Load Factor
Load Factor for Turbo-generators
​ Go Load Factor = Average Load/Peak Load

Peak Load given Load Factor for Turbo-Generators Formula

Peak Load = Average Load/Load Factor
PL = LAvg/LF

What is meant by Load Factor?

The Load Factor for Turbo-generators is defined as the ratio of the average load over a given period of time to the maximum demand (peak load) occurring in that period.

How to Calculate Peak Load given Load Factor for Turbo-Generators?

Peak Load given Load Factor for Turbo-Generators calculator uses Peak Load = Average Load/Load Factor to calculate the Peak Load, The Peak Load given Load Factor for Turbo-Generators is defined as the period of time when electrical power is needed sustained period based on demand. Also known as peak demand. Peak Load is denoted by PL symbol.

How to calculate Peak Load given Load Factor for Turbo-Generators using this online calculator? To use this online calculator for Peak Load given Load Factor for Turbo-Generators, enter Average Load (LAvg) & Load Factor (LF) and hit the calculate button. Here is how the Peak Load given Load Factor for Turbo-Generators calculation can be explained with given input values -> 0.004 = 400/0.1.

FAQ

What is Peak Load given Load Factor for Turbo-Generators?
The Peak Load given Load Factor for Turbo-Generators is defined as the period of time when electrical power is needed sustained period based on demand. Also known as peak demand and is represented as PL = LAvg/LF or Peak Load = Average Load/Load Factor. Average Load is the average load occurring on the power station in a given period known as an average load & Load Factor is the ratio of average load to the maximum demand during a given period.
How to calculate Peak Load given Load Factor for Turbo-Generators?
The Peak Load given Load Factor for Turbo-Generators is defined as the period of time when electrical power is needed sustained period based on demand. Also known as peak demand is calculated using Peak Load = Average Load/Load Factor. To calculate Peak Load given Load Factor for Turbo-Generators, you need Average Load (LAvg) & Load Factor (LF). With our tool, you need to enter the respective value for Average Load & Load Factor and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!