How to Calculate Peak Rate of Runoff from Dredge Formula?
Peak Rate of Runoff from Dredge Formula calculator uses Peak Rate of Runoff from dredge formula = 19.6*(Catchment Area in KM/(Length of Drain)^(2/3)) to calculate the Peak Rate of Runoff from dredge formula, The Peak Rate of Runoff from Dredge Formula is defined as the maximum flow at outlet thus attained is called peak flow of runoff. Peak Rate of Runoff from dredge formula is denoted by Qd symbol.
How to calculate Peak Rate of Runoff from Dredge Formula using this online calculator? To use this online calculator for Peak Rate of Runoff from Dredge Formula, enter Catchment Area in KM (Akm) & Length of Drain (L) and hit the calculate button. Here is how the Peak Rate of Runoff from Dredge Formula calculation can be explained with given input values -> 3.1E+7 = 19.6*(2500000/(3500)^(2/3)).