Scraper Cycle Time given Number of Scrapers Pusher can Load Solution

STEP 0: Pre-Calculation Summary
Formula Used
Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time)
Ts = (Np*Tp)
This formula uses 3 Variables
Variables Used
Scraper Cycle Time - (Measured in Second) - Scraper Cycle Time is estimated by adding the fixed times to load, dumps, and turn around.
Number of Scraper a Pusher - Number of Scraper a Pusher can load calculates the scraper number when scraper and pusher cycle time is known.
Pusher Cycle Time - (Measured in Second) - Pusher Cycle Time consists of maneuver time and load time.
STEP 1: Convert Input(s) to Base Unit
Number of Scraper a Pusher: 12 --> No Conversion Required
Pusher Cycle Time: 3.01 Minute --> 180.6 Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Ts = (Np*Tp) --> (12*180.6)
Evaluating ... ...
Ts = 2167.2
STEP 3: Convert Result to Output's Unit
2167.2 Second -->36.12 Minute (Check conversion here)
FINAL ANSWER
36.12 Minute <-- Scraper Cycle Time
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

25 Scraper Production Calculators

Speed at Haul and Return in Miles per Hour given Variable Time
Go Speed in Miles per Hour in Scraper Production = (Haul Distance in Feet+Return Distance in Foot in Scraper Production)/(88*Variable Time in Scraper Production)
Variable Time when Haul and Return Distance is in Feet
Go Variable Time in Scraper Production = (Haul Distance in Feet+Return Distance in Foot in Scraper Production)/(88*Speed in Miles per Hour in Scraper Production)
Return Distance in Feet given Variable Time
Go Return Distance in Foot in Scraper Production = (Variable Time in Scraper Production*88*Speed in Miles per Hour in Scraper Production)-Haul Distance in Feet
Haul Distance in Feet given Variable Time
Go Haul Distance in Feet = (Variable Time in Scraper Production*88*Speed in Miles per Hour in Scraper Production)-Return Distance in Foot in Scraper Production
Speed at Haul and Return in Kilometer per Hour given Variable Time
Go Speed in Kmph in Scraper Production = (Haul Distance+Return Distance in Meter)/(16.7*Variable Time in Scraper Production)
Return Distance in Meter given Variable Time
Go Return Distance in Meter = (Variable Time in Scraper Production*16.7*Speed in Kmph in Scraper Production)-Haul Distance
Haul Distance in Meter given Variable Time
Go Haul Distance = (Variable Time in Scraper Production*16.7*Speed in Kmph in Scraper Production)-Return Distance in Meter
Production Required to Determine Number of Scrapers
Go Production Required in Scraper Production = (Bank in Scraper Production/Time in Scraper Production in Hour)
Working Time given Production Required
Go Time in Scraper Production in Hour = (Bank in Scraper Production/Production Required in Scraper Production)
Quantity given Production Required
Go Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour)
Production Required given Number of Scrapers Needed for Job
Go Production Required in Scraper Production = Number of Scraper in Scraper Production*Production per Unit
Trips per Hour given Production of Scrap by Machines
Go Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
Load Given Production of Scrap by Machines
Go Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
Production of Scrap by Machines
Go Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Number of Scrapers Needed for Job
Go Number of Scraper = (Production Required in Scraper Production/Production per Unit)
Density of Material given Quantity of Scrap Produced
Go Density of Material in Scraper Production = (Weight of Load Scrap/Bank in Scraper)
Weight of Load Given Quantity of Scrap Produced
Go Weight of Load Scrap = (Bank in Scraper*Density of Material in Scraper Production)
Bank or Quantity of Scrap Produced
Go Bank in Scraper = (Weight of Load Scrap/Density of Material in Scraper Production)
Scraper Cycle Time given Number of Scrapers Pusher can Load
Go Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time)
Pusher Cycle Time given Number of Scrapers Pusher can Load
Go Pusher Cycle Time = (Scraper Cycle Time/Number of Scraper a Pusher)
Number of Scrapers Pusher can Load
Go Number of Scraper a Pusher = (Scraper Cycle Time/Pusher Cycle Time)
Working Time given Trips per Hour for Excavating Scrap
Go Working Time in Scraper Production = (Trips per Hour*Cycle Time)
Cycle Time given Trips per Hour for Excavating Scrap
Go Cycle Time = (Working Time in Scraper Production/Trips per Hour)
Trips per Hour for Excavating Scrap
Go Trips per Hour = (Working Time in Scraper Production/Cycle Time)
Production per Unit Given Number of Scrapers Needed for Job
Go Production per Unit = (Production Required/Number of Scraper)

Scraper Cycle Time given Number of Scrapers Pusher can Load Formula

Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time)
Ts = (Np*Tp)

What is Scraper?

Scraper, in engineering, machine for moving earth over short distances (up to about two miles) over relatively smooth areas. Either self-propelled or towed, it consists of a wagon with a gate having a bladed bottom. The blade scrapes up earth as the wagon pushes forward and forces the excavated material into the wagon.

How to Calculate Scraper Cycle Time given Number of Scrapers Pusher can Load?

Scraper Cycle Time given Number of Scrapers Pusher can Load calculator uses Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time) to calculate the Scraper Cycle Time, The Scraper Cycle Time given Number of Scrapers Pusher can Load is defined as the time required by the scraper in completing one cycle of work. Scraper Cycle Time is denoted by Ts symbol.

How to calculate Scraper Cycle Time given Number of Scrapers Pusher can Load using this online calculator? To use this online calculator for Scraper Cycle Time given Number of Scrapers Pusher can Load, enter Number of Scraper a Pusher (Np) & Pusher Cycle Time (Tp) and hit the calculate button. Here is how the Scraper Cycle Time given Number of Scrapers Pusher can Load calculation can be explained with given input values -> 0.6 = (12*180.6).

FAQ

What is Scraper Cycle Time given Number of Scrapers Pusher can Load?
The Scraper Cycle Time given Number of Scrapers Pusher can Load is defined as the time required by the scraper in completing one cycle of work and is represented as Ts = (Np*Tp) or Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time). Number of Scraper a Pusher can load calculates the scraper number when scraper and pusher cycle time is known & Pusher Cycle Time consists of maneuver time and load time.
How to calculate Scraper Cycle Time given Number of Scrapers Pusher can Load?
The Scraper Cycle Time given Number of Scrapers Pusher can Load is defined as the time required by the scraper in completing one cycle of work is calculated using Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time). To calculate Scraper Cycle Time given Number of Scrapers Pusher can Load, you need Number of Scraper a Pusher (Np) & Pusher Cycle Time (Tp). With our tool, you need to enter the respective value for Number of Scraper a Pusher & Pusher Cycle Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
โœ–
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!