Time Taken in Standard Specimen Testing Solution

STEP 0: Pre-Calculation Summary
Formula Used
Time = 501.28/(Permeability Number*Pressure in Casting)
tp = 501.28/(PN*pc)
This formula uses 3 Variables
Variables Used
Time - (Measured in Second) - Time is the fundamental dimension of measurement.
Permeability Number - (Measured in Henry per Meter) - Permeability Number is the rate of flow of air passing through a standard specimen under a standard pressure.
Pressure in Casting - (Measured in Pascal) - Pressure in Casting is the force per unit area.
STEP 1: Convert Input(s) to Base Unit
Permeability Number: 4.36 Henry per Meter --> 4.36 Henry per Meter No Conversion Required
Pressure in Casting: 3.9 Kilogram-Force per Square Meter --> 38.2459349999973 Pascal (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
tp = 501.28/(PN*pc) --> 501.28/(4.36*38.2459349999973)
Evaluating ... ...
tp = 3.00613586945196
STEP 3: Convert Result to Output's Unit
3.00613586945196 Second --> No Conversion Required
FINAL ANSWER
3.00613586945196 3.006136 Second <-- Time
(Calculation completed in 00.004 seconds)

Credits

Created by Rajat Vishwakarma
University Institute of Technology RGPV (UIT - RGPV), Bhopal
Rajat Vishwakarma has created this Calculator and 400+ more calculators!
Verified by Nishan Poojary
Shri Madhwa Vadiraja Institute of Technology and Management (SMVITM), Udupi
Nishan Poojary has verified this Calculator and 400+ more calculators!

11 Permeability Number Calculators

Cross-Sectional Area of Specimen
Go Cross-sectional area of specimen = (Volume of Air Flow through Specimen*Specimen Height)/(Permeability Number*Air pressure on wall*Time)
Air Pressure during Testing
Go Air pressure on wall = (Volume of Air Flow through Specimen*Specimen Height)/(Permeability Number*Cross-sectional area of specimen*Time)
Time Taken during Testing
Go Time = (Volume of Air Flow through Specimen*Specimen Height)/(Permeability Number*Air pressure on wall*Cross-sectional area of specimen)
Volume of Air Passed through Specimen
Go Volume of Air Flow through Specimen = (Permeability Number*Air pressure on wall*Cross-sectional area of specimen*Time)/Specimen Height
Height of Specimen
Go Specimen Height = (Permeability Number*Air pressure on wall*Cross-sectional area of specimen*Time)/Volume of Air Flow through Specimen
Permeability Number
Go Permeability Number = (Volume of air*Height of Specimen)/(Air pressure on wall*Cross-sectional area of specimen*Time)
Grain Fineness Number
Go Grain Fineness Number = Sum of Product of Factor and Grams/Total Mass of Sand
Pressure during Testing or Standard Specimen
Go Pressure in Casting = 501.28/(Permeability Number*Time)
Permeability Number or Standard Specimen
Go Permeability Number = 501.28/(Pressure in Casting*Time)
Time Taken in Standard Specimen Testing
Go Time = 501.28/(Permeability Number*Pressure in Casting)
Ranginess Factor
Go Ranginess Factor = Modulus of Cube/Modulus of Casting

Time Taken in Standard Specimen Testing Formula

Time = 501.28/(Permeability Number*Pressure in Casting)
tp = 501.28/(PN*pc)

What is permeability number?

The Permeability Number the rate of flow of air passing through a standard specimen under a standard pressure.
The standard permeability test is to measure time taken by a 2000 cub cm of air at a pressure typically of 980 Pa (10 g/cm2), to pass through a standard sand specimen confined in a specimen tube. The standard specimen size is 50.8 mm in diameter and a length of 50.8 mm

How to Calculate Time Taken in Standard Specimen Testing?

Time Taken in Standard Specimen Testing calculator uses Time = 501.28/(Permeability Number*Pressure in Casting) to calculate the Time, The Time taken in standard specimen testing is the time in minutes gas take to flow completely through the specimen. Time is denoted by tp symbol.

How to calculate Time Taken in Standard Specimen Testing using this online calculator? To use this online calculator for Time Taken in Standard Specimen Testing, enter Permeability Number (PN) & Pressure in Casting (pc) and hit the calculate button. Here is how the Time Taken in Standard Specimen Testing calculation can be explained with given input values -> 3.013864 = 501.28/(4.36*38.2459349999973).

FAQ

What is Time Taken in Standard Specimen Testing?
The Time taken in standard specimen testing is the time in minutes gas take to flow completely through the specimen and is represented as tp = 501.28/(PN*pc) or Time = 501.28/(Permeability Number*Pressure in Casting). Permeability Number is the rate of flow of air passing through a standard specimen under a standard pressure & Pressure in Casting is the force per unit area.
How to calculate Time Taken in Standard Specimen Testing?
The Time taken in standard specimen testing is the time in minutes gas take to flow completely through the specimen is calculated using Time = 501.28/(Permeability Number*Pressure in Casting). To calculate Time Taken in Standard Specimen Testing, you need Permeability Number (PN) & Pressure in Casting (pc). With our tool, you need to enter the respective value for Permeability Number & Pressure in Casting and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Time?
In this formula, Time uses Permeability Number & Pressure in Casting. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Time = (Volume of Air Flow through Specimen*Specimen Height)/(Permeability Number*Air pressure on wall*Cross-sectional area of specimen)
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!