Total Machining Time or Total Machine Time Solution

STEP 0: Pre-Calculation Summary
Formula Used
Total Machining Time = Batch Size*Machining Time
TMT = Nb*tm
This formula uses 3 Variables
Variables Used
Total Machining Time - (Measured in Second) - Total Machining Time is the total processing time required on one or more machines to produce a batch of products.
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
Machining Time - (Measured in Second) - Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
STEP 1: Convert Input(s) to Base Unit
Batch Size: 2 --> No Conversion Required
Machining Time: 46 Second --> 46 Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
TMT = Nb*tm --> 2*46
Evaluating ... ...
TMT = 92
STEP 3: Convert Result to Output's Unit
92 Second -->1.53333333333333 Minute (Check conversion here)
FINAL ANSWER
1.53333333333333 1.533333 Minute <-- Total Machining Time
(Calculation completed in 00.004 seconds)

Credits

Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

22 Economics Of Metal-Cutting Operation Calculators

Total Production Time given Time for Individual Operation and Batch Size
Go Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool)
Non-Productive Time for Each Component given Average Production Time
Go Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size))
Time for changing one Tool given Average Production Time
Go Time to Change One Tool = (Average Production Time-(Setup Time+Machining Time))*Batch Size/Number of Tools Used
Machining Time of Each Component given Average Production Time
Go Machining Time = Average Production Time-Setup Time-(Number of Tools Used*Time to Change One Tool/Batch Size)
Batch Size given Average Production Time
Go Batch Size = Time to Change One Tool*Number of Tools Used/(Average Production Time-(Setup Time+Machining Time))
Average Production Time of Each Component
Go Average Production Time = Setup Time+Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)
Total Production Time
Go Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time)
Machining and Operating Rate given Total Machining and Operating Cost
Go Machining and Operating Rate = Total Machining And Operating Cost/Total Production Time
Total Production Time given Total Machining and Operating Cost
Go Total Production Time = Total Machining And Operating Cost/Machining and Operating Rate
Total Machining and Operating Cost
Go Total Machining And Operating Cost = Machining and Operating Rate*Total Production Time
Total Non-Productive Cost
Go Total Production Cost = Non-Productive Time*Machining and Operating Rate
Total Tool-Changing Cost
Go Total Tool Changing Cost = Total Tool Changing Time*Number of Tools Used
Time for Changing one Tool given Total Tool Changing Time
Go Time to Change One Tool = Total Tool Changing Time/Number of Tools Used
Total Tool Changing Time
Go Total Tool Changing Time = Number of Tools Used*Time to Change One Tool
Cost of Tool given Total Cost of Tools
Go Cost of a Tool = Total Cost of Tools Used/Number of Tools Used
Total Cost of Tools Used
Go Total Cost of Tools Used = Number of Tools Used*Cost of a Tool
Machining Time for one Component using Total Machining Time
Go Machining Time = Total Machining Time/Batch Size
Total Machining Time or Total Machine Time
Go Total Machining Time = Batch Size*Machining Time
Size of Batch given Total Machining Time
Go Batch Size = Total Machining Time/Machining Time
Load or Unload or Setup Time given Total Non-Productive Time
Go Setup Time = Non-Productive Time/Batch Size
Size of Batch using Total Non-Productive Time
Go Batch Size = Non-Productive Time/Setup Time
Total Non-Productive Time
Go Non-Productive Time = Batch Size*Setup Time

Total Machining Time or Total Machine Time Formula

Total Machining Time = Batch Size*Machining Time
TMT = Nb*tm

Necessity Of Estimation Of Total Machine Time

The major aim and objectives in machining industries generally are;
1. Reduction of total manufacturing time
2. Increase in MRR, i.e., productivity
3. Reduction in machining cost without sacrificing product quality
4. Increase in profit or profit rate, i.e., profitability.

How to Calculate Total Machining Time or Total Machine Time?

Total Machining Time or Total Machine Time calculator uses Total Machining Time = Batch Size*Machining Time to calculate the Total Machining Time, The Total Machining Time or Total Machine Time is defined as the total processing time required by a whole batch of components on one or more machines to produce a final batch of products. Total Machining Time is denoted by TMT symbol.

How to calculate Total Machining Time or Total Machine Time using this online calculator? To use this online calculator for Total Machining Time or Total Machine Time, enter Batch Size (Nb) & Machining Time (tm) and hit the calculate button. Here is how the Total Machining Time or Total Machine Time calculation can be explained with given input values -> 0.025556 = 2*46.

FAQ

What is Total Machining Time or Total Machine Time?
The Total Machining Time or Total Machine Time is defined as the total processing time required by a whole batch of components on one or more machines to produce a final batch of products and is represented as TMT = Nb*tm or Total Machining Time = Batch Size*Machining Time. Batch Size is the count of similar kinds of products to be manufactured & Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
How to calculate Total Machining Time or Total Machine Time?
The Total Machining Time or Total Machine Time is defined as the total processing time required by a whole batch of components on one or more machines to produce a final batch of products is calculated using Total Machining Time = Batch Size*Machining Time. To calculate Total Machining Time or Total Machine Time, you need Batch Size (Nb) & Machining Time (tm). With our tool, you need to enter the respective value for Batch Size & Machining Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.