Total Non-Productive Time Solution

STEP 0: Pre-Calculation Summary
Formula Used
Non-Productive Time = Batch Size*Setup Time
NPT = Nb*ts
This formula uses 3 Variables
Variables Used
Non-Productive Time - (Measured in Second) - Non-Productive Time is the total time wasted in setting up the machine or workpiece for a particular process.
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
Setup Time - (Measured in Second) - Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
STEP 1: Convert Input(s) to Base Unit
Batch Size: 2 --> No Conversion Required
Setup Time: 0.9 Minute --> 54 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
NPT = Nb*ts --> 2*54
Evaluating ... ...
NPT = 108
STEP 3: Convert Result to Output's Unit
108 Second -->1.8 Minute (Check conversion ​here)
FINAL ANSWER
1.8 Minute <-- Non-Productive Time
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

9 Total Production Time Calculators

Total Production Time given Time for Individual Operation and Batch Size
​ Go Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool)
Total Production Time
​ Go Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time)
Total Production Time given Total Machining and Operating Cost
​ Go Total Production Time = Total Machining And Operating Cost/Machining and Operating Rate
Machining Time for one Component using Total Machining Time
​ Go Machining Time = Total Machining Time/Batch Size
Total Machining Time or Total Machine Time
​ Go Total Machining Time = Batch Size*Machining Time
Size of Batch given Total Machining Time
​ Go Batch Size = Total Machining Time/Machining Time
Load or Unload or Setup Time given Total Non-Productive Time
​ Go Setup Time = Non-Productive Time/Batch Size
Size of Batch using Total Non-Productive Time
​ Go Batch Size = Non-Productive Time/Setup Time
Total Non-Productive Time
​ Go Non-Productive Time = Batch Size*Setup Time

Total Non-Productive Time Formula

Non-Productive Time = Batch Size*Setup Time
NPT = Nb*ts

Why do we need to reduce Non-Productive Time ?

Non-Productive Time is the time actually being consumed in processes that result in no benefit to the Production House. If these processes are optimized, then the time available for actual production increases, resulting in more profit for the day.

How to Calculate Total Non-Productive Time?

Total Non-Productive Time calculator uses Non-Productive Time = Batch Size*Setup Time to calculate the Non-Productive Time, The Total Non-Productive Time is defined as the total time taken to loading/unloading the workpiece and repositioning the tool for the manufacturing of a unit product. Non-Productive Time is denoted by NPT symbol.

How to calculate Total Non-Productive Time using this online calculator? To use this online calculator for Total Non-Productive Time, enter Batch Size (Nb) & Setup Time (ts) and hit the calculate button. Here is how the Total Non-Productive Time calculation can be explained with given input values -> 0.03 = 2*54.

FAQ

What is Total Non-Productive Time?
The Total Non-Productive Time is defined as the total time taken to loading/unloading the workpiece and repositioning the tool for the manufacturing of a unit product and is represented as NPT = Nb*ts or Non-Productive Time = Batch Size*Setup Time. Batch Size is the count of similar kinds of products to be manufactured & Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
How to calculate Total Non-Productive Time?
The Total Non-Productive Time is defined as the total time taken to loading/unloading the workpiece and repositioning the tool for the manufacturing of a unit product is calculated using Non-Productive Time = Batch Size*Setup Time. To calculate Total Non-Productive Time, you need Batch Size (Nb) & Setup Time (ts). With our tool, you need to enter the respective value for Batch Size & Setup Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.