Peaking Factor using Peak Discharge in Circular Settling Tanks Solution

STEP 0: Pre-Calculation Summary
Formula Used
Peaking factor = (Peak Discharge/Average Daily Load)
f = (Qp/q)
This formula uses 3 Variables
Variables Used
Peaking factor - Peaking factor is the ratio of the maximum flow to the average daily flow in a water system.
Peak Discharge - (Measured in Cubic Meter per Second) - Peak Discharge is the maximum volume flow rate passing a particular location during an event.
Average Daily Load - (Measured in Cubic Meter per Second) - Average Daily Load is a customer's average daily consumption of water in MLD.
STEP 1: Convert Input(s) to Base Unit
Peak Discharge: 4 Cubic Meter per Second --> 4 Cubic Meter per Second No Conversion Required
Average Daily Load: 2.1 Cubic Meter per Second --> 2.1 Cubic Meter per Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
f = (Qp/q) --> (4/2.1)
Evaluating ... ...
f = 1.9047619047619
STEP 3: Convert Result to Output's Unit
1.9047619047619 --> No Conversion Required
FINAL ANSWER
1.9047619047619 1.904762 <-- Peaking factor
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

15 Design of a Circular Settling Tank Calculators

Mixed Liquor Suspended Solids in Aeration Tank using Maximum Solids
Go MLSS = (Maximum Solids in Aeriation Tank/((Peak Discharge+Return Activated Sludge)*8.34))
Design Surface Loading Rate given Surface Area of Circular Settling Tank
Go Surface Loading Rate = (Peak Discharge/Surface Area)
Average Daily Load using Peak Discharge in Circular Settling Tanks
Go Average Daily Load = (Peak Discharge/Peaking factor)
Peaking Factor using Peak Discharge in Circular Settling Tanks
Go Peaking factor = (Peak Discharge/Average Daily Load)
Peak Discharge given Surface Area of Circular Settling Tank
Go Peak Discharge = (Surface Area*Surface Loading Rate)
Surface Area of Circular Settling Tank
Go Surface Area = (Peak Discharge/Surface Loading Rate)
Solids Processed given Actual Solid Loading Rate
Go Solid Processed = (Solid Loading Rate*Surface Area)
Assumed Solid Loading Rate of Circular Settling Tanks
Go Solid Loading Rate = (Maximum Solids/Surface Area)
Peak Discharge in Circular Settling Tanks
Go Peak Discharge = Average Daily Load*Peaking factor
Total Settling Tank Surface Area given Actual Solid Loading Rate
Go Surface Area = Solid Processed/Solid Loading Rate
Actual Solid Loading Rate of Circular Settling Tanks
Go Solid Loading Rate = Solid Processed/Surface Area
Maximum Solids given Solid Loading Rate
Go Maximum Solids = Surface Area*Solid Loading Rate
Surface Area given Solid Loading Rate
Go Surface Area = Maximum Solids/Solid Loading Rate
Influent Flow Rate given Return Activated Sludge Flow Rate
Go Average Daily Influent Flow Rate = (Return Activated Sludge/1.25)
Return Activated Sludge Flow Rate
Go Return Activated Sludge = 1.25*Average Daily Influent Flow Rate

Peaking Factor using Peak Discharge in Circular Settling Tanks Formula

Peaking factor = (Peak Discharge/Average Daily Load)
f = (Qp/q)

What is Peaking Factor ?

The peaking factor (PF) is the ratio of the maximum flow to the average daily flow in a water system. The PF concept has been used in both the drinking water and wastewater industries for nearly 100 years.

How to Calculate Peaking Factor using Peak Discharge in Circular Settling Tanks?

Peaking Factor using Peak Discharge in Circular Settling Tanks calculator uses Peaking factor = (Peak Discharge/Average Daily Load) to calculate the Peaking factor, The Peaking Factor using Peak Discharge in Circular Settling Tanks is defined as the ratio of the maximum flow to the average daily flow in a water system. Peaking factor is denoted by f symbol.

How to calculate Peaking Factor using Peak Discharge in Circular Settling Tanks using this online calculator? To use this online calculator for Peaking Factor using Peak Discharge in Circular Settling Tanks, enter Peak Discharge (Qp) & Average Daily Load (q) and hit the calculate button. Here is how the Peaking Factor using Peak Discharge in Circular Settling Tanks calculation can be explained with given input values -> 2 = (4/2.1).

FAQ

What is Peaking Factor using Peak Discharge in Circular Settling Tanks?
The Peaking Factor using Peak Discharge in Circular Settling Tanks is defined as the ratio of the maximum flow to the average daily flow in a water system and is represented as f = (Qp/q) or Peaking factor = (Peak Discharge/Average Daily Load). Peak Discharge is the maximum volume flow rate passing a particular location during an event & Average Daily Load is a customer's average daily consumption of water in MLD.
How to calculate Peaking Factor using Peak Discharge in Circular Settling Tanks?
The Peaking Factor using Peak Discharge in Circular Settling Tanks is defined as the ratio of the maximum flow to the average daily flow in a water system is calculated using Peaking factor = (Peak Discharge/Average Daily Load). To calculate Peaking Factor using Peak Discharge in Circular Settling Tanks, you need Peak Discharge (Qp) & Average Daily Load (q). With our tool, you need to enter the respective value for Peak Discharge & Average Daily Load and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!