STEP 0: Pre-Calculation Summary
Formula Used
Raw sludge = 3*Equivalent digested sludge
V1 = 3*V2
This formula uses 2 Variables
Variables Used
Raw sludge - (Measured in Cubic Meter per Second) - Raw sludge is defined as the volume of raw sludge added per day .
Equivalent digested sludge - (Measured in Cubic Meter per Second) - Equivalent digested sludge is the volume of sludge produced per day.
STEP 1: Convert Input(s) to Base Unit
Equivalent digested sludge: 3 Cubic Meter per Day --> 3.47222222222222E-05 Cubic Meter per Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
V1 = 3*V2 --> 3*3.47222222222222E-05
Evaluating ... ...
V1 = 0.000104166666666667
STEP 3: Convert Result to Output's Unit
0.000104166666666667 Cubic Meter per Second -->8.99999999999999 Cubic Meter per Day (Check conversion ​here)
FINAL ANSWER
8.99999999999999 9 Cubic Meter per Day <-- Raw sludge
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

8 Sludge Digestion Tank or Digesters Calculators

Volume of Digester given Number of Days for which Digested Sludge is Stored
​ Go Volume of digester = (((Raw sludge+Equivalent digested sludge)/2)*Digestion period)+(Equivalent digested sludge*Time in Days)
Number of Days for which Digested Sludge is Stored
​ Go Time in Days = (Volume of digester-(((Raw sludge+Equivalent digested sludge)/2)*Digestion period))/Equivalent digested sludge
Equivalent Digested Sludge Produced Per Day given Digestion Period
​ Go Equivalent digested sludge = (Volume of digester-((Raw sludge*Digestion period)/2))/((0.5*Digestion period)+Time in Days)
Volume of Digester when Digestion is Parabolic
​ Go Volume of digester = (Raw sludge-((2*(Raw sludge-Equivalent digested sludge))/3))*Digestion period
Raw Sludge Added Per Day given Digestion is Parabolic
​ Go Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge)
Volume of Digester
​ Go Volume of digester = ((Raw sludge+Equivalent digested sludge)/2)*Digestion period
Equivalent Digested Sludge Produced Per Day given Raw Sludge Added Per Day
​ Go Equivalent digested sludge = Raw sludge/3
Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day
​ Go Raw sludge = 3*Equivalent digested sludge

Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day Formula

Raw sludge = 3*Equivalent digested sludge
V1 = 3*V2

What is raw sludge ?

Raw sludge is untreated non-stabilized sludge, which can be taken from wastewater treatment plants. It tends to acidify digestion and produces odour.

How to Calculate Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day?

Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day calculator uses Raw sludge = 3*Equivalent digested sludge to calculate the Raw sludge, Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day calculates calculates raw sludge produced per day when we have prior information of other parameters used. Raw sludge is denoted by V1 symbol.

How to calculate Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day using this online calculator? To use this online calculator for Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day, enter Equivalent digested sludge (V2) and hit the calculate button. Here is how the Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day calculation can be explained with given input values -> 777600 = 3*3.47222222222222E-05.

FAQ

What is Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day?
Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day calculates calculates raw sludge produced per day when we have prior information of other parameters used and is represented as V1 = 3*V2 or Raw sludge = 3*Equivalent digested sludge. Equivalent digested sludge is the volume of sludge produced per day.
How to calculate Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day?
Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day calculates calculates raw sludge produced per day when we have prior information of other parameters used is calculated using Raw sludge = 3*Equivalent digested sludge. To calculate Raw Sludge Added Per Day given Equivalent Digested Sludge Produced Per Day, you need Equivalent digested sludge (V2). With our tool, you need to enter the respective value for Equivalent digested sludge and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Raw sludge?
In this formula, Raw sludge uses Equivalent digested sludge. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Raw sludge = ((3*Volume of digester)/Digestion period)+(2*Equivalent digested sludge)