Sludge Feed Rate for Dewatering Facility Solution

STEP 0: Pre-Calculation Summary
Formula Used
Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sv = (Ds/T)
This formula uses 3 Variables
Variables Used
Volumetric Sludge Feed Rate - (Measured in Cubic Meter per Second) - Volumetric Sludge Feed Rate relates the daily wastewater load and the available sludge mass.
Digested Sludge - (Measured in Cubic Meter per Second) - Digested Sludge is the product of either aerobic or anaerobic digestion and is a well-stabilized material capable of being dewatered.
Operation Time - (Measured in Second) - Operation Time is the time for which the dewatering is going on.
STEP 1: Convert Input(s) to Base Unit
Digested Sludge: 24 Cubic Meter per Second --> 24 Cubic Meter per Second No Conversion Required
Operation Time: 10 Second --> 10 Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Sv = (Ds/T) --> (24/10)
Evaluating ... ...
Sv = 2.4
STEP 3: Convert Result to Output's Unit
2.4 Cubic Meter per Second --> No Conversion Required
FINAL ANSWER
2.4 Cubic Meter per Second <-- Volumetric Sludge Feed Rate
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

9 Sludge Volume and Feed Rate Calculators

Percent Reduction in Sludge Volume
Go Volume Reduction = (Sludge Volume in-Sludge Volume Out)/Sludge Volume in
Solids Recovery given Dewatered Sludge Discharge Rate
Go Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate)
Dewatered Sludge or Cake Discharge Rate
Go Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal)
Sludge Feed Rate using Dewatered Sludge Discharge Rate
Go Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal
Digested Sludge using Sludge Feed Rate for Dewatering Facility
Go Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Operation Time given Sludge Feed Rate for Dewatering Facility
Go Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate)
Sludge Feed Rate for Dewatering Facility
Go Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sludge Volume-in given Percent Reduction in Sludge Volume
Go Sludge Volume in = (Sludge Volume Out/(1-Volume Reduction))
Sludge Volume-out given Percent Reduction in Sludge Volume
Go Sludge Volume Out = Sludge Volume in*(1-Volume Reduction)

Sludge Feed Rate for Dewatering Facility Formula

Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sv = (Ds/T)

What is sludge loading rate ?

The sludge loading rate relates the daily wastewater load (kg BOD / d) and the available sludge mass. The sludge loading rate is, in addition to the sludge retention time, the main design variable of an activated sludge plant.

How to Calculate Sludge Feed Rate for Dewatering Facility?

Sludge Feed Rate for Dewatering Facility calculator uses Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time) to calculate the Volumetric Sludge Feed Rate, The Sludge Feed Rate for Dewatering Facility is defined as the daily wastewater load and the available sludge mass. Volumetric Sludge Feed Rate is denoted by Sv symbol.

How to calculate Sludge Feed Rate for Dewatering Facility using this online calculator? To use this online calculator for Sludge Feed Rate for Dewatering Facility, enter Digested Sludge (Ds) & Operation Time (T) and hit the calculate button. Here is how the Sludge Feed Rate for Dewatering Facility calculation can be explained with given input values -> 2.4 = (24/10).

FAQ

What is Sludge Feed Rate for Dewatering Facility?
The Sludge Feed Rate for Dewatering Facility is defined as the daily wastewater load and the available sludge mass and is represented as Sv = (Ds/T) or Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time). Digested Sludge is the product of either aerobic or anaerobic digestion and is a well-stabilized material capable of being dewatered & Operation Time is the time for which the dewatering is going on.
How to calculate Sludge Feed Rate for Dewatering Facility?
The Sludge Feed Rate for Dewatering Facility is defined as the daily wastewater load and the available sludge mass is calculated using Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time). To calculate Sludge Feed Rate for Dewatering Facility, you need Digested Sludge (Ds) & Operation Time (T). With our tool, you need to enter the respective value for Digested Sludge & Operation Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!