Solids Processed given Actual Solid Loading Rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
Solid Processed = (Solid Loading Rate*Surface Area)
Ps = (AQ*SA)
This formula uses 3 Variables
Variables Used
Solid Processed - (Measured in Kilogram per Second) - Solid processed is defined in terms of mass flow rate.
Solid Loading Rate - (Measured in Kilogram per Second Square Meter) - Solid Loading Rate is the rate at which solid is loaded in a given surface area as mass flow rate.
Surface Area - (Measured in Square Meter) - The Surface Area of a three-dimensional shape is the sum of all of the surface areas of each of the sides.
STEP 1: Convert Input(s) to Base Unit
Solid Loading Rate: 0.17 kilogram per Day Square Meter --> 1.96759259259259E-06 Kilogram per Second Square Meter (Check conversion ​here)
Surface Area: 18 Square Meter --> 18 Square Meter No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Ps = (AQ*SA) --> (1.96759259259259E-06*18)
Evaluating ... ...
Ps = 3.54166666666666E-05
STEP 3: Convert Result to Output's Unit
3.54166666666666E-05 Kilogram per Second -->3.06 Kilogram per Day (Check conversion ​here)
FINAL ANSWER
3.06 Kilogram per Day <-- Solid Processed
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

15 Design of a Circular Settling Tank Calculators

Mixed Liquor Suspended Solids in Aeration Tank using Maximum Solids
​ Go MLSS = (Maximum Solids in Aeriation Tank/((Peak Discharge+Return Activated Sludge)*8.34))
Design Surface Loading Rate given Surface Area of Circular Settling Tank
​ Go Surface Loading Rate = (Peak Discharge/Surface Area)
Average Daily Load using Peak Discharge in Circular Settling Tanks
​ Go Average Daily Load = (Peak Discharge/Peaking factor)
Peaking Factor using Peak Discharge in Circular Settling Tanks
​ Go Peaking factor = (Peak Discharge/Average Daily Load)
Peak Discharge given Surface Area of Circular Settling Tank
​ Go Peak Discharge = (Surface Area*Surface Loading Rate)
Surface Area of Circular Settling Tank
​ Go Surface Area = (Peak Discharge/Surface Loading Rate)
Solids Processed given Actual Solid Loading Rate
​ Go Solid Processed = (Solid Loading Rate*Surface Area)
Assumed Solid Loading Rate of Circular Settling Tanks
​ Go Solid Loading Rate = (Maximum Solids/Surface Area)
Peak Discharge in Circular Settling Tanks
​ Go Peak Discharge = Average Daily Load*Peaking factor
Total Settling Tank Surface Area given Actual Solid Loading Rate
​ Go Surface Area = Solid Processed/Solid Loading Rate
Actual Solid Loading Rate of Circular Settling Tanks
​ Go Solid Loading Rate = Solid Processed/Surface Area
Maximum Solids given Solid Loading Rate
​ Go Maximum Solids = Surface Area*Solid Loading Rate
Surface Area given Solid Loading Rate
​ Go Surface Area = Maximum Solids/Solid Loading Rate
Influent Flow Rate given Return Activated Sludge Flow Rate
​ Go Average Daily Influent Flow Rate = (Return Activated Sludge/1.25)
Return Activated Sludge Flow Rate
​ Go Return Activated Sludge = 1.25*Average Daily Influent Flow Rate

Solids Processed given Actual Solid Loading Rate Formula

Solid Processed = (Solid Loading Rate*Surface Area)
Ps = (AQ*SA)

What is Solids Loading Rate ?

Solids loading rate (SLR) SLR is the amount of solids per day that can be removed per square foot of surface area by a clarifier (lbs/day/ft²).

How to Calculate Solids Processed given Actual Solid Loading Rate?

Solids Processed given Actual Solid Loading Rate calculator uses Solid Processed = (Solid Loading Rate*Surface Area) to calculate the Solid Processed, The Solids Processed given Actual Solid Loading Rate is defined as the solid processed when we have prior information of solid loading rate and surface area of tank. Solid Processed is denoted by Ps symbol.

How to calculate Solids Processed given Actual Solid Loading Rate using this online calculator? To use this online calculator for Solids Processed given Actual Solid Loading Rate, enter Solid Loading Rate (AQ) & Surface Area (SA) and hit the calculate button. Here is how the Solids Processed given Actual Solid Loading Rate calculation can be explained with given input values -> 264384 = (1.96759259259259E-06*18).

FAQ

What is Solids Processed given Actual Solid Loading Rate?
The Solids Processed given Actual Solid Loading Rate is defined as the solid processed when we have prior information of solid loading rate and surface area of tank and is represented as Ps = (AQ*SA) or Solid Processed = (Solid Loading Rate*Surface Area). Solid Loading Rate is the rate at which solid is loaded in a given surface area as mass flow rate & The Surface Area of a three-dimensional shape is the sum of all of the surface areas of each of the sides.
How to calculate Solids Processed given Actual Solid Loading Rate?
The Solids Processed given Actual Solid Loading Rate is defined as the solid processed when we have prior information of solid loading rate and surface area of tank is calculated using Solid Processed = (Solid Loading Rate*Surface Area). To calculate Solids Processed given Actual Solid Loading Rate, you need Solid Loading Rate (AQ) & Surface Area (SA). With our tool, you need to enter the respective value for Solid Loading Rate & Surface Area and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.