Total Non-Productive Time using Average Production Cost Solution

STEP 0: Pre-Calculation Summary
Formula Used
Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*Machining Time)-(Cost of A Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of A Tool))/Cost of A Tool
NPT = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct
This formula uses 7 Variables
Variables Used
Non Productive Time - (Measured in Second) - Non Productive Time is the total time wasted in setting up the machine or workpiece for a particular process.
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
Production Cost of Each Component - Production Cost of Each Component is the total amount that it takes to produce a single component from scratch.
Cost of A Tool - The Cost of a Tool is simply the cost of one tool being used for machining.
Machining Time - (Measured in Second) - Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
Number of Tools Used - The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Time to Change One Tool - (Measured in Second) - Time to Change One Tool is the measure of time it takes to change one tool during machining.
STEP 1: Convert Input(s) to Base Unit
Batch Size: 2 --> No Conversion Required
Production Cost of Each Component: 15000 --> No Conversion Required
Cost of A Tool: 80 --> No Conversion Required
Machining Time: 1.15 Minute --> 69 Second (Check conversion ​here)
Number of Tools Used: 4.16129 --> No Conversion Required
Time to Change One Tool: 0.5 Minute --> 30 Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
NPT = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct --> (2*(15000-80*69)-(80*4.16129*30)-(4.16129*80))/80
Evaluating ... ...
NPT = 108.00001
STEP 3: Convert Result to Output's Unit
108.00001 Second -->1.80000016666667 Minute (Check conversion ​here)
FINAL ANSWER
1.80000016666667 1.8 Minute <-- Non Productive Time
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

18 Average Production Cost Calculators

Total Non-Productive Time using Average Production Cost
​ Go Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*Machining Time)-(Cost of A Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of A Tool))/Cost of A Tool
Machining and Operating Rate given Average Production Cost of each Component
​ Go Machining and Operating Rate = (Production Cost of Each Component-(Number of Tools Used*Cost of A Tool/Batch Size))/(Setup Time+Machining Time+(Number of Tools Used*Tool Changing Time/Batch Size))
Tool Changing Time for Each Tool given Average Production Cost
​ Go Time to Change One Tool = (Batch Size*(Production Cost of Each Component-Cost of A Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of A Tool)/(Cost of A Tool*Number of Tools Used)
Total Machining Time using Average Production Cost
​ Go Total Machining Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*Setup Time)-Number of Tools Used*(Cost of A Tool*Time to Change One Tool+Cost of A Tool))/(Cost of A Tool)
Tool Changing Cost of Each Product using Average Production Cost
​ Go Cost of changing each Tool = (Batch Size*Production Cost of Each Component-Batch Size*Cost of A Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of A Tool)/(Number of Tools Used)
Machining Time for Each Product given Average Production Cost
​ Go Machining Time = (Production Cost of Each Component-Cost of A Tool*Setup Time-(Number of Tools Used/Batch Size)*(Cost of A Tool*Time to Change One Tool+Cost of A Tool))/Cost of A Tool
Setup Time for Each Product given Average Production Cost
​ Go Setup Time = (Production Cost of Each Component-Cost of A Tool*Machining Time-(Number of Tools Used/Batch Size)*(Cost of A Tool*Time to Change One Tool+Cost of A Tool))/Cost of A Tool
Non-Productive Cost of Component given Average Production Cost
​ Go Non Another Productive Cost of Each Component = Production Cost of Each Component-(Cost of A Tool*Machining Time+(Number of Tools Used/Batch Size)*((Cost of A Tool*Tool Changing Time)+Cost of A Tool))
Total Non-Productive Cost given Average Production Cost
​ Go Total Non Productive Cost = Batch Size*(Production Cost of Each Component-(Cost of A Tool*Machining Time))-(Number of Tools Used*((Cost of A Tool*Tool Changing Time)+Cost of A Tool))
Total Cost of Tools used given Average Production Cost
​ Go Total Cost of Tools Used = (Batch Size*(Production Cost of Each Component-Cost of A Tool*(Setup Time+Machining Time))-Cost of A Tool*Number of Tools Used*Time to Change One Tool)
Batch Size given Average Production Cost
​ Go Batch Size = Number of Tools Used*((Cost of A Tool*Time to Change One Tool)+Cost of A Tool)/(Production Cost of Each Component-(Cost of A Tool*(Setup Time+Machining Time)))
Total Tool Changing Time using Average Production Cost
​ Go Total Tool Changing Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of A Tool)/(Cost of A Tool)
Number of Tools used given Average Production Cost
​ Go Number of Tools Used = Batch Size*(Production Cost of Each Component-Cost of A Tool*(Setup Time+Machining Time))/(Cost of A Tool*Time to Change One Tool+Cost of A Tool)
Average Production Cost of each component
​ Go Production Cost of Each Component = Cost of A Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of A Tool*Tool Changing Time)+Cost of A Tool)
Total Tool Changing Cost using Average Production Cost
​ Go Total Tool Changing Cost = Batch Size*(Production Cost of Each Component-Cost of A Tool*(Setup Time+Machining Time))-Number of Tools Used*Cost of A Tool
Average Production Cost of Each Component using Individual Costs
​ Go Production Cost of Each Component = (Total Non-Productive Cost+Total Machining And Operating Cost+Total Tool Changing Cost+Total Cost of Tools Used)/Batch Size
Number of Tools used given Average Production Time
​ Go Number of Tools Used = Batch Size*(Average Production Time-(Setup Time+Machining Time))/Time to Change One Tool
Average Production Cost of each Component given Total Production Cost
​ Go Production Cost of Each Component = Total Production Cost/Batch Size

Total Non-Productive Time using Average Production Cost Formula

Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*Machining Time)-(Cost of A Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of A Tool))/Cost of A Tool
NPT = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct

Significance of Total Non-Productive Time

The Total Non-Productive Time helps the concerned to determine the resource of the industry being wasted due to time lapse in important but non-profitable processes of the production line. It also helps in determining the required measures to be taken to increase the productivity of the plant which generally includes steps to decrease the Total Non-Productive Cost.

How to Calculate Total Non-Productive Time using Average Production Cost?

Total Non-Productive Time using Average Production Cost calculator uses Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*Machining Time)-(Cost of A Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of A Tool))/Cost of A Tool to calculate the Non Productive Time, The Total Non-Productive Time using Average Production Cost is a method to determine the total time taken to load/unload the workpiece and repositioning the tool for the manufacturing of a batch of Products. Non Productive Time is denoted by NPT symbol.

How to calculate Total Non-Productive Time using Average Production Cost using this online calculator? To use this online calculator for Total Non-Productive Time using Average Production Cost, enter Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of A Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc) and hit the calculate button. Here is how the Total Non-Productive Time using Average Production Cost calculation can be explained with given input values -> 0.03 = (2*(15000-80*69)-(80*4.16129*30)-(4.16129*80))/80.

FAQ

What is Total Non-Productive Time using Average Production Cost?
The Total Non-Productive Time using Average Production Cost is a method to determine the total time taken to load/unload the workpiece and repositioning the tool for the manufacturing of a batch of Products and is represented as NPT = (Nb*(Cpr-Ct*tm)-(Ct*Nt*tc)-(Nt*Ct))/Ct or Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*Machining Time)-(Cost of A Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of A Tool))/Cost of A Tool. Batch Size is the count of similar kinds of products to be manufactured, Production Cost of Each Component is the total amount that it takes to produce a single component from scratch, The Cost of a Tool is simply the cost of one tool being used for machining, Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material, The Number of Tools Used is the total number of tools used for manufacturing a batch of products & Time to Change One Tool is the measure of time it takes to change one tool during machining.
How to calculate Total Non-Productive Time using Average Production Cost?
The Total Non-Productive Time using Average Production Cost is a method to determine the total time taken to load/unload the workpiece and repositioning the tool for the manufacturing of a batch of Products is calculated using Non Productive Time = (Batch Size*(Production Cost of Each Component-Cost of A Tool*Machining Time)-(Cost of A Tool*Number of Tools Used*Time to Change One Tool)-(Number of Tools Used*Cost of A Tool))/Cost of A Tool. To calculate Total Non-Productive Time using Average Production Cost, you need Batch Size (Nb), Production Cost of Each Component (Cpr), Cost of A Tool (Ct), Machining Time (tm), Number of Tools Used (Nt) & Time to Change One Tool (tc). With our tool, you need to enter the respective value for Batch Size, Production Cost of Each Component, Cost of A Tool, Machining Time, Number of Tools Used & Time to Change One Tool and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.