Total Production Time Solution

STEP 0: Pre-Calculation Summary
Formula Used
Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time)
TPT = (TMT+NPT+TCT)
This formula uses 4 Variables
Variables Used
Total Production Time - (Measured in Second) - Total Production Time is the net time taken to produce a complete match of products, including overheads.
Total Machining Time - (Measured in Second) - Total Machining Time is the total processing time required on one or more machines to produce a batch of products.
Non-Productive Time - (Measured in Second) - Non-Productive Time is the total time wasted in setting up the machine or workpiece for a particular process.
Total Tool Changing Time - (Measured in Second) - Total Tool Changing Time is the average time required by the operator or automation system to change the tool.
STEP 1: Convert Input(s) to Base Unit
Total Machining Time: 100 Minute --> 6000 Second (Check conversion here)
Non-Productive Time: 20 Minute --> 1200 Second (Check conversion here)
Total Tool Changing Time: 4.5 Minute --> 270 Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
TPT = (TMT+NPT+TCT) --> (6000+1200+270)
Evaluating ... ...
TPT = 7470
STEP 3: Convert Result to Output's Unit
7470 Second -->124.5 Minute (Check conversion here)
FINAL ANSWER
124.5 Minute <-- Total Production Time
(Calculation completed in 00.004 seconds)

Credits

Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

22 Economics Of Metal-Cutting Operation Calculators

Total Production Time given Time for Individual Operation and Batch Size
Go Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool)
Non-Productive Time for Each Component given Average Production Time
Go Setup Time = Average Production Time-(Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size))
Time for changing one Tool given Average Production Time
Go Time to Change One Tool = (Average Production Time-(Setup Time+Machining Time))*Batch Size/Number of Tools Used
Machining Time of Each Component given Average Production Time
Go Machining Time = Average Production Time-Setup Time-(Number of Tools Used*Time to Change One Tool/Batch Size)
Batch Size given Average Production Time
Go Batch Size = Time to Change One Tool*Number of Tools Used/(Average Production Time-(Setup Time+Machining Time))
Average Production Time of Each Component
Go Average Production Time = Setup Time+Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size)
Total Production Time
Go Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time)
Machining and Operating Rate given Total Machining and Operating Cost
Go Machining and Operating Rate = Total Machining And Operating Cost/Total Production Time
Total Production Time given Total Machining and Operating Cost
Go Total Production Time = Total Machining And Operating Cost/Machining and Operating Rate
Total Machining and Operating Cost
Go Total Machining And Operating Cost = Machining and Operating Rate*Total Production Time
Total Non-Productive Cost
Go Total Production Cost = Non-Productive Time*Machining and Operating Rate
Total Tool-Changing Cost
Go Total Tool Changing Cost = Total Tool Changing Time*Number of Tools Used
Time for Changing one Tool given Total Tool Changing Time
Go Time to Change One Tool = Total Tool Changing Time/Number of Tools Used
Total Tool Changing Time
Go Total Tool Changing Time = Number of Tools Used*Time to Change One Tool
Cost of Tool given Total Cost of Tools
Go Cost of a Tool = Total Cost of Tools Used/Number of Tools Used
Total Cost of Tools Used
Go Total Cost of Tools Used = Number of Tools Used*Cost of a Tool
Machining Time for one Component using Total Machining Time
Go Machining Time = Total Machining Time/Batch Size
Total Machining Time or Total Machine Time
Go Total Machining Time = Batch Size*Machining Time
Size of Batch given Total Machining Time
Go Batch Size = Total Machining Time/Machining Time
Load or Unload or Setup Time given Total Non-Productive Time
Go Setup Time = Non-Productive Time/Batch Size
Size of Batch using Total Non-Productive Time
Go Batch Size = Non-Productive Time/Setup Time
Total Non-Productive Time
Go Non-Productive Time = Batch Size*Setup Time

Total Production Time Formula

Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time)
TPT = (TMT+NPT+TCT)

What is Batch Production ?

Batch production is a method of manufacturing where the products are made as specified groups or amounts, within a time frame. A batch can go through a series of steps in a large manufacturing process to make the final desired product.

How to Calculate Total Production Time?

Total Production Time calculator uses Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time) to calculate the Total Production Time, The Total Production Time is defined as the total time it takes to produce a complete batch of components from scratch. Total Production Time is denoted by TPT symbol.

How to calculate Total Production Time using this online calculator? To use this online calculator for Total Production Time, enter Total Machining Time (TMT), Non-Productive Time (NPT) & Total Tool Changing Time (TCT) and hit the calculate button. Here is how the Total Production Time calculation can be explained with given input values -> 2.075 = (6000+1200+270).

FAQ

What is Total Production Time?
The Total Production Time is defined as the total time it takes to produce a complete batch of components from scratch and is represented as TPT = (TMT+NPT+TCT) or Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time). Total Machining Time is the total processing time required on one or more machines to produce a batch of products, Non-Productive Time is the total time wasted in setting up the machine or workpiece for a particular process & Total Tool Changing Time is the average time required by the operator or automation system to change the tool.
How to calculate Total Production Time?
The Total Production Time is defined as the total time it takes to produce a complete batch of components from scratch is calculated using Total Production Time = (Total Machining Time+Non-Productive Time+Total Tool Changing Time). To calculate Total Production Time, you need Total Machining Time (TMT), Non-Productive Time (NPT) & Total Tool Changing Time (TCT). With our tool, you need to enter the respective value for Total Machining Time, Non-Productive Time & Total Tool Changing Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Total Production Time?
In this formula, Total Production Time uses Total Machining Time, Non-Productive Time & Total Tool Changing Time. We can use 2 other way(s) to calculate the same, which is/are as follows -
  • Total Production Time = (Batch Size*Setup Time+Batch Size*Machining Time+Number of Tools Used*Time to Change One Tool)
  • Total Production Time = Total Machining And Operating Cost/Machining and Operating Rate