Download Vibration Control in Blasting PDF

Related PDFs (16)

Bearing Capacity of Cohesive Soil
Formulas : 28   Size : 368 kb
Bearing Capacity of Non-cohesive Soil
Formulas : 18   Size : 309 kb
Atterberg Limits
Formulas : 16   Size : 319 kb
Scraper Production
Formulas : 25   Size : 405 kb
Seepage Analysis
Formulas : 52   Size : 586 kb
Soil Origin and Its Properties
Formulas : 31   Size : 431 kb
Specific Gravity of Soil
Formulas : 16   Size : 344 kb
Terzaghi's Analysis: Purely Cohesive Soil
Formulas : 23   Size : 360 kb
Void Ratio of Soil Sample
Formulas : 23   Size : 361 kb
Water Content of Soil and Related Formulas
Formulas : 27   Size : 403 kb

Contents of the Vibration Control in Blasting PDF

List of 39 Vibration Control in Blasting Formulas

Acceleration of Particles disturbed by Vibrations
Amplitude of Vibrations given Acceleration of Particles
Amplitude of Vibrations using Velocity of Particle
Burden given Spacing for Multiple Simultaneous Blasting
Burden given Stemming at Top of Borehole
Burden Suggested in Konya Formula
Burden Suggested in Langefors' Formula
Diameter of Borehole using Burden
Diameter of Borehole using Minimum Length of Borehole
Diameter of Drill Bit using Burden Suggested in Langefors' Formula
Diameter of Explosive using Burden Suggested in Konya Formula
Distance from Blast Hole to Nearest Perpendicular Free Face or Burden
Distance from Explosion to Exposure given Overpressure
Distance of Particle One from Site of Explosion
Distance of Particle Two from Site of Explosion given Velocity
Distance to Exposure given Scaled Distance for Vibration Control
Frequency of Vibration given Acceleration of Particles
Frequency of Vibration given Velocity of Particle
Frequency of Vibrations caused by Blasting
Length of Borehole given Spacing for Multiple Simultaneous Blasting
Length of Borehole using Burden
Maximum Weight of Explosives given Scaled Distance for Vibration Control
Minimum Length of Borehole in Feet
Minimum Length of Borehole in Meter
Overburden given Stemming at Top of Borehole
Overpressure due to Charge Exploded on Ground Surface
Overpressure given Sound Pressure Level in Decibels
Scaled Distance for Vibration Control
Sound Pressure Level in Decibels
Spacing for Multiple Simultaneous Blasting
Specific Gravity of Explosive using Burden Suggested in Konya Formula
Specific Gravity of Rock using Burden Suggested in Konya Formula
Stemming at Top of Borehole to Prevent Explosive Gases from Escaping
Velocity of Particle One at Distance from Explosion
Velocity of Particle Two at distance from Explosion
Velocity of Particles disturbed by Vibrations
Velocity of Vibrations caused by Blasting
Wavelength of Vibrations caused by Blasting
Weight Strength of Explosive using Burden Suggested in Langefors' Formula

Variables used in Vibration Control in Blasting PDF

  1. a Acceleration of Particles (Meter per Square Second)
  2. A Amplitude of Vibration (Millimeter)
  3. B Burden (Foot)
  4. BL Burden in Langefors' Formula (Meter)
  5. c Rock Constant
  6. D Distance from Explosion to Exposure (Meter)
  7. D1 Distance of Particle 1 from Explosion (Meter)
  8. D2 Distance of Particle 2 from Explosion (Meter)
  9. db Diameter of Drill Bit (Millimeter)
  10. De Diameter of Explosive (Inch)
  11. Df Degree of Fraction
  12. Dh Diameter of Borehole (Foot)
  13. Dp Degree of Packing (Kilogram per Cubic Decimeter)
  14. Dpith Diameter of Bore Pith Circle (Meter)
  15. Dscaled Scaled Distance (Meter)
  16. dB Sound Pressure Level (Decibel)
  17. EV Ratio of Spacing to Burden
  18. f Frequency of Vibration (Hertz)
  19. H Constant of Scaled Distance
  20. L Length of Borehole (Foot)
  21. OB Overburden (Foot)
  22. P Overpressure (Kilopascal)
  23. s Weight Strength of Explosive
  24. S Stemming at Top of Borehole (Foot)
  25. Sb Blasting Space (Foot)
  26. SGe Specific Gravity of Explosive
  27. SGr Specific Gravity of Rock
  28. v Velocity of Particle (Millimeter per Second)
  29. V Velocity of Vibration (Meter per Second)
  30. v1 Velocity of Particle with Mass m1 (Meter per Second)
  31. v2 Velocity of Particle with Mass m2 (Meter per Second)
  32. W Maximum Weight of Explosives per Delay (Kilogram)
  33. β Constant of Scaled Distance β
  34. λv Wavelength of Vibration (Meter)

Constants, Functions and Measurements used in Vibration Control in Blasting PDF

  1. Constant: pi, 3.14159265358979323846264338327950288
    Archimedes' constant
  2. Function: sqrt, sqrt(Number)
    A square root function is a function that takes a non-negative number as an input and returns the square root of the given input number.
  3. Measurement: Length in Millimeter (mm), Foot (ft), Inch (in), Meter (m)
    Length Unit Conversion
  4. Measurement: Weight in Kilogram (kg)
    Weight Unit Conversion
  5. Measurement: Pressure in Kilopascal (kPa)
    Pressure Unit Conversion
  6. Measurement: Speed in Millimeter per Second (mm/s), Meter per Second (m/s)
    Speed Unit Conversion
  7. Measurement: Acceleration in Meter per Square Second (m/s²)
    Acceleration Unit Conversion
  8. Measurement: Frequency in Hertz (Hz)
    Frequency Unit Conversion
  9. Measurement: Density in Kilogram per Cubic Decimeter (kg/dm³)
    Density Unit Conversion
  10. Measurement: Sound in Decibel (dB)
    Sound Unit Conversion

Free Vibration Control in Blasting PDF

Get Free Vibration Control in Blasting PDF for Download today. Examples are included after each Formula with a link to a live Calculator! All the Formulas and Calculators support Unit Conversion as well. This PDF features 39 calculators from Civil. Inside, you'll discover a list of formulas such as Wavelength of Vibrations caused by Blasting, Velocity of Vibrations caused by Blasting and 39 more formulas!. The Variables, Functions and Constants are summarized at the end. Explore and share Vibration Control in Blasting PDFs!

Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!