Working Time given Trips per Hour for Excavating Scrap Solution

STEP 0: Pre-Calculation Summary
Formula Used
Working Time in Scraper Production = (Trips per Hour*Cycle Time)
WT = (f*Ct)
This formula uses 3 Variables
Variables Used
Working Time in Scraper Production - Working Time in Scraper Production is the ratio of time which is expressed in hr/hr.
Trips per Hour - (Measured in Hertz) - Trips per Hour means the total transfer occured in a hour.
Cycle Time - (Measured in Second) - Cycle Time is the time taken to complete one trip.
STEP 1: Convert Input(s) to Base Unit
Trips per Hour: 4 Revolution per Hour --> 0.00111111111111111 Hertz (Check conversion here)
Cycle Time: 6 Hour --> 21600 Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
WT = (f*Ct) --> (0.00111111111111111*21600)
Evaluating ... ...
WT = 24
STEP 3: Convert Result to Output's Unit
24 --> No Conversion Required
FINAL ANSWER
24 <-- Working Time in Scraper Production
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Mridul Sharma
Indian Institute of Information Technology (IIIT), Bhopal
Mridul Sharma has verified this Calculator and 1700+ more calculators!

25 Scraper Production Calculators

Speed at Haul and Return in Miles per Hour given Variable Time
Go Speed in Miles per Hour in Scraper Production = (Haul Distance in Feet+Return Distance in Foot in Scraper Production)/(88*Variable Time in Scraper Production)
Variable Time when Haul and Return Distance is in Feet
Go Variable Time in Scraper Production = (Haul Distance in Feet+Return Distance in Foot in Scraper Production)/(88*Speed in Miles per Hour in Scraper Production)
Return Distance in Feet given Variable Time
Go Return Distance in Foot in Scraper Production = (Variable Time in Scraper Production*88*Speed in Miles per Hour in Scraper Production)-Haul Distance in Feet
Haul Distance in Feet given Variable Time
Go Haul Distance in Feet = (Variable Time in Scraper Production*88*Speed in Miles per Hour in Scraper Production)-Return Distance in Foot in Scraper Production
Speed at Haul and Return in Kilometer per Hour given Variable Time
Go Speed in Kmph in Scraper Production = (Haul Distance+Return Distance in Meter)/(16.7*Variable Time in Scraper Production)
Return Distance in Meter given Variable Time
Go Return Distance in Meter = (Variable Time in Scraper Production*16.7*Speed in Kmph in Scraper Production)-Haul Distance
Haul Distance in Meter given Variable Time
Go Haul Distance = (Variable Time in Scraper Production*16.7*Speed in Kmph in Scraper Production)-Return Distance in Meter
Production Required to Determine Number of Scrapers
Go Production Required in Scraper Production = (Bank in Scraper Production/Time in Scraper Production in Hour)
Working Time given Production Required
Go Time in Scraper Production in Hour = (Bank in Scraper Production/Production Required in Scraper Production)
Quantity given Production Required
Go Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour)
Production Required given Number of Scrapers Needed for Job
Go Production Required in Scraper Production = Number of Scraper in Scraper Production*Production per Unit
Trips per Hour given Production of Scrap by Machines
Go Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
Load Given Production of Scrap by Machines
Go Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
Production of Scrap by Machines
Go Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Number of Scrapers Needed for Job
Go Number of Scraper = (Production Required in Scraper Production/Production per Unit)
Density of Material given Quantity of Scrap Produced
Go Density of Material in Scraper Production = (Weight of Load Scrap/Bank in Scraper)
Weight of Load Given Quantity of Scrap Produced
Go Weight of Load Scrap = (Bank in Scraper*Density of Material in Scraper Production)
Bank or Quantity of Scrap Produced
Go Bank in Scraper = (Weight of Load Scrap/Density of Material in Scraper Production)
Scraper Cycle Time given Number of Scrapers Pusher can Load
Go Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time)
Pusher Cycle Time given Number of Scrapers Pusher can Load
Go Pusher Cycle Time = (Scraper Cycle Time/Number of Scraper a Pusher)
Number of Scrapers Pusher can Load
Go Number of Scraper a Pusher = (Scraper Cycle Time/Pusher Cycle Time)
Working Time given Trips per Hour for Excavating Scrap
Go Working Time in Scraper Production = (Trips per Hour*Cycle Time)
Cycle Time given Trips per Hour for Excavating Scrap
Go Cycle Time = (Working Time in Scraper Production/Trips per Hour)
Trips per Hour for Excavating Scrap
Go Trips per Hour = (Working Time in Scraper Production/Cycle Time)
Production per Unit Given Number of Scrapers Needed for Job
Go Production per Unit = (Production Required/Number of Scraper)

Working Time given Trips per Hour for Excavating Scrap Formula

Working Time in Scraper Production = (Trips per Hour*Cycle Time)
WT = (f*Ct)

What is Cycle Time?

Cycle Time is the amount of time a team spends actually working on producing an item, up until the product is ready for shipment. It is the time it takes to complete one task.

How to Calculate Working Time given Trips per Hour for Excavating Scrap?

Working Time given Trips per Hour for Excavating Scrap calculator uses Working Time in Scraper Production = (Trips per Hour*Cycle Time) to calculate the Working Time in Scraper Production, The Working Time given Trips per Hour for Excavating Scrap is defined as the time taken to complete the work of scrap production. Working Time in Scraper Production is denoted by WT symbol.

How to calculate Working Time given Trips per Hour for Excavating Scrap using this online calculator? To use this online calculator for Working Time given Trips per Hour for Excavating Scrap, enter Trips per Hour (f) & Cycle Time (Ct) and hit the calculate button. Here is how the Working Time given Trips per Hour for Excavating Scrap calculation can be explained with given input values -> 24 = (0.00111111111111111*21600).

FAQ

What is Working Time given Trips per Hour for Excavating Scrap?
The Working Time given Trips per Hour for Excavating Scrap is defined as the time taken to complete the work of scrap production and is represented as WT = (f*Ct) or Working Time in Scraper Production = (Trips per Hour*Cycle Time). Trips per Hour means the total transfer occured in a hour & Cycle Time is the time taken to complete one trip.
How to calculate Working Time given Trips per Hour for Excavating Scrap?
The Working Time given Trips per Hour for Excavating Scrap is defined as the time taken to complete the work of scrap production is calculated using Working Time in Scraper Production = (Trips per Hour*Cycle Time). To calculate Working Time given Trips per Hour for Excavating Scrap, you need Trips per Hour (f) & Cycle Time (Ct). With our tool, you need to enter the respective value for Trips per Hour & Cycle Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.