Dewatered Sludge or Cake Discharge Rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal)
Cd = (Sf*R)
This formula uses 3 Variables
Variables Used
Cake Discharge Rate - (Measured in Kilogram per Second) - Cake Discharge Rate is a measure of the quantity of dry solid flow over unit time.
Sludge Feed Rate - (Measured in Kilogram per Second) - Sludge Feed Rate is the daily wastewater load (kg BOD / d) and the available sludge mass.
Solid Recovery in Decimal - The Solid Recovery in Decimal is the Efficient removal of contaminants resulting in a purified sludge matrix in the form of a fraction.
STEP 1: Convert Input(s) to Base Unit
Sludge Feed Rate: 45 Pound per Hour --> 0.00566990462512544 Kilogram per Second (Check conversion here)
Solid Recovery in Decimal: 0.6 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Cd = (Sf*R) --> (0.00566990462512544*0.6)
Evaluating ... ...
Cd = 0.00340194277507526
STEP 3: Convert Result to Output's Unit
0.00340194277507526 Kilogram per Second -->27 Pound per Hour (Check conversion here)
FINAL ANSWER
27 Pound per Hour <-- Cake Discharge Rate
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

9 Sludge Volume and Feed Rate Calculators

Percent Reduction in Sludge Volume
Go Volume Reduction = (Sludge Volume in-Sludge Volume Out)/Sludge Volume in
Solids Recovery given Dewatered Sludge Discharge Rate
Go Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate)
Dewatered Sludge or Cake Discharge Rate
Go Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal)
Sludge Feed Rate using Dewatered Sludge Discharge Rate
Go Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal
Digested Sludge using Sludge Feed Rate for Dewatering Facility
Go Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Operation Time given Sludge Feed Rate for Dewatering Facility
Go Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate)
Sludge Feed Rate for Dewatering Facility
Go Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sludge Volume-in given Percent Reduction in Sludge Volume
Go Sludge Volume in = (Sludge Volume Out/(1-Volume Reduction))
Sludge Volume-out given Percent Reduction in Sludge Volume
Go Sludge Volume Out = Sludge Volume in*(1-Volume Reduction)

Dewatered Sludge or Cake Discharge Rate Formula

Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal)
Cd = (Sf*R)

What is Dewatering of Sludge ?

Sludge Dewatering is the practice of minimizing waste by volume to prepare for its effective disposal. Sludge originates during the process of treating wastewater before the water can be released back into the environment.

How to Calculate Dewatered Sludge or Cake Discharge Rate?

Dewatered Sludge or Cake Discharge Rate calculator uses Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal) to calculate the Cake Discharge Rate, The Dewatered Sludge or Cake Discharge Rate calculates the dewatered sludge when we have prior information of sludge feed rate and percent solid recovery . Cake Discharge Rate is denoted by Cd symbol.

How to calculate Dewatered Sludge or Cake Discharge Rate using this online calculator? To use this online calculator for Dewatered Sludge or Cake Discharge Rate, enter Sludge Feed Rate (Sf) & Solid Recovery in Decimal (R) and hit the calculate button. Here is how the Dewatered Sludge or Cake Discharge Rate calculation can be explained with given input values -> 1.9E+8 = (0.00566990462512544*0.6).

FAQ

What is Dewatered Sludge or Cake Discharge Rate?
The Dewatered Sludge or Cake Discharge Rate calculates the dewatered sludge when we have prior information of sludge feed rate and percent solid recovery and is represented as Cd = (Sf*R) or Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal). Sludge Feed Rate is the daily wastewater load (kg BOD / d) and the available sludge mass & The Solid Recovery in Decimal is the Efficient removal of contaminants resulting in a purified sludge matrix in the form of a fraction.
How to calculate Dewatered Sludge or Cake Discharge Rate?
The Dewatered Sludge or Cake Discharge Rate calculates the dewatered sludge when we have prior information of sludge feed rate and percent solid recovery is calculated using Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal). To calculate Dewatered Sludge or Cake Discharge Rate, you need Sludge Feed Rate (Sf) & Solid Recovery in Decimal (R). With our tool, you need to enter the respective value for Sludge Feed Rate & Solid Recovery in Decimal and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!