Solids Recovery given Dewatered Sludge Discharge Rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate)
R = (Cd/Sf)
This formula uses 3 Variables
Variables Used
Solid Recovery in Decimal - Solid Recovery in Decimal refers to the percentage of solid material that is recovered from a process or system designed to separate solids from a mixture.
Cake Discharge Rate - (Measured in Kilogram per Second) - Cake Discharge Rate is a measure of the quantity of dry solid flow over unit time.
Sludge Feed Rate - (Measured in Kilogram per Second) - Sludge Feed Rate refers to the rate at which sludge is introduced into a treatment process.
STEP 1: Convert Input(s) to Base Unit
Cake Discharge Rate: 27 Pound per Hour --> 0.00340194277507527 Kilogram per Second (Check conversion ​here)
Sludge Feed Rate: 45 Pound per Hour --> 0.00566990462512544 Kilogram per Second (Check conversion ​here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
R = (Cd/Sf) --> (0.00340194277507527/0.00566990462512544)
Evaluating ... ...
R = 0.600000000000001
STEP 3: Convert Result to Output's Unit
0.600000000000001 --> No Conversion Required
FINAL ANSWER
0.600000000000001 0.6 <-- Solid Recovery in Decimal
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

9 Sludge Volume and Feed Rate Calculators

Percent Reduction in Sludge Volume
​ Go Volume Reduction = (Sludge Volume in-Sludge Volume Out)/Sludge Volume in
Solids Recovery given Dewatered Sludge Discharge Rate
​ Go Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate)
Dewatered Sludge or Cake Discharge Rate
​ Go Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal)
Sludge Feed Rate using Dewatered Sludge Discharge Rate
​ Go Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal
Digested Sludge using Sludge Feed Rate for Dewatering Facility
​ Go Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Operation Time given Sludge Feed Rate for Dewatering Facility
​ Go Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate)
Sludge Feed Rate for Dewatering Facility
​ Go Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sludge Volume-in given Percent Reduction in Sludge Volume
​ Go Sludge Volume in = (Sludge Volume Out/(1-Volume Reduction))
Sludge Volume-out given Percent Reduction in Sludge Volume
​ Go Sludge Volume Out = Sludge Volume in*(1-Volume Reduction)

Solids Recovery given Dewatered Sludge Discharge Rate Formula

Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate)
R = (Cd/Sf)

What is percent solids ?

Percent solids refer to the ratio of the solid mass of a material present in a liquid (or semi-liquid) sample. The quantification of percent solids is used when applying corrosion preventive coatings on metals. The higher the percent solids, the more viscous a coat is and vice versa.

How to Calculate Solids Recovery given Dewatered Sludge Discharge Rate?

Solids Recovery given Dewatered Sludge Discharge Rate calculator uses Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate) to calculate the Solid Recovery in Decimal, The Solids Recovery given Dewatered Sludge Discharge Rate calculates the value of solids recovery when we have prior information of cake discharge rate and sludge feed rate. Solid Recovery in Decimal is denoted by R symbol.

How to calculate Solids Recovery given Dewatered Sludge Discharge Rate using this online calculator? To use this online calculator for Solids Recovery given Dewatered Sludge Discharge Rate, enter Cake Discharge Rate (Cd) & Sludge Feed Rate (Sf) and hit the calculate button. Here is how the Solids Recovery given Dewatered Sludge Discharge Rate calculation can be explained with given input values -> 0.6 = (0.00340194277507527/0.00566990462512544).

FAQ

What is Solids Recovery given Dewatered Sludge Discharge Rate?
The Solids Recovery given Dewatered Sludge Discharge Rate calculates the value of solids recovery when we have prior information of cake discharge rate and sludge feed rate and is represented as R = (Cd/Sf) or Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate). Cake Discharge Rate is a measure of the quantity of dry solid flow over unit time & Sludge Feed Rate refers to the rate at which sludge is introduced into a treatment process.
How to calculate Solids Recovery given Dewatered Sludge Discharge Rate?
The Solids Recovery given Dewatered Sludge Discharge Rate calculates the value of solids recovery when we have prior information of cake discharge rate and sludge feed rate is calculated using Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate). To calculate Solids Recovery given Dewatered Sludge Discharge Rate, you need Cake Discharge Rate (Cd) & Sludge Feed Rate (Sf). With our tool, you need to enter the respective value for Cake Discharge Rate & Sludge Feed Rate and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!