Surface area of Workpiece given Surface Generation rate Solution

STEP 0: Pre-Calculation Summary
Formula Used
Surface Area of Workpiece = (Machining Time for Minimum Cost*Surface Generation Rate)
Am = (tmc*Rsg)
This formula uses 3 Variables
Variables Used
Surface Area of Workpiece - (Measured in Square Meter) - The Surface Area of Workpiece is defined as the total surface/lateral surface area of the workpiece.
Machining Time for Minimum Cost - (Measured in Second) - Machining Time for Minimum Cost is the time for processing when the workpiece is machined to obtain the minimum cost of Machining.
Surface Generation Rate - (Measured in Square Meter per Second) - Surface Generation Rate is defined as the constant for every material of the workpiece.
STEP 1: Convert Input(s) to Base Unit
Machining Time for Minimum Cost: 53.13 Second --> 53.13 Second No Conversion Required
Surface Generation Rate: 1083.33 Square Millimeter per Second --> 0.00108333 Square Meter per Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Am = (tmc*Rsg) --> (53.13*0.00108333)
Evaluating ... ...
Am = 0.0575573229
STEP 3: Convert Result to Output's Unit
0.0575573229 Square Meter -->57557.3229 Square Millimeter (Check conversion here)
FINAL ANSWER
57557.3229 57557.32 Square Millimeter <-- Surface Area of Workpiece
(Calculation completed in 00.004 seconds)

Credits

Created by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has created this Calculator and 300+ more calculators!
Verified by Rajat Vishwakarma
University Institute of Technology RGPV (UIT - RGPV), Bhopal
Rajat Vishwakarma has verified this Calculator and 400+ more calculators!

19 Initial Weight of Workpiece Calculators

Initial weight of workpiece given Total rate for Machining and Operator
Go Initial Work Piece Weight = ((Total Rate of Machining and Operator-(Factor to Allow For Operator*Direct Labor Rate))*(2*Amortized Years*Number of Shifts)/(Constant For Tool Type(e)*Factor to Allow For Machining))^(1/Constant for Tool Type(f))
Direct labour Rate given Total rate for Machining and Operator
Go Direct Labor Rate = (Total Rate of Machining and Operator-((Factor to Allow For Machining*Constant For Tool Type(e)*Initial Work Piece Weight^Constant for Tool Type(f))/(2*Amortized Years*Number of Shifts)))/Factor to Allow For Operator
Total rate for Machining and Operator
Go Total Rate of Machining and Operator = ((Factor to Allow For Machining*Constant For Tool Type(e)*Initial Work Piece Weight^Constant for Tool Type(f))/(2*Amortized Years*Number of Shifts))+(Factor to Allow For Operator*Direct Labor Rate)
Initial weight of workpiece given Machining time for maximum power
Go Initial Work Piece Weight = ((Density of Work Piece*Constant For Tool Type(a)*Machining Time For Maximum Power)/(Proportion of Initial Volume*Specific Cutting Energy in Machining))^(1/(1-Constant For Tool Type(b)))
Proportion of Initial Volume of workpiece to be removed given Initial weight of workpiece
Go Proportion of Initial Volume = (Machining Time For Maximum Power*Density of Work Piece*Constant For Tool Type(a))/(Specific Cutting Energy in Machining*Initial Work Piece Weight^(1-Constant For Tool Type(b)))
Specific cutting energy given Initial weight of workpiece
Go Specific Cutting Energy in Machining = (Machining Time For Maximum Power*Density of Work Piece*Constant For Tool Type(a))/(Proportion of Initial Volume*Initial Work Piece Weight^(1-Constant For Tool Type(b)))
Density of Workpiece given Initial weight of workpiece
Go Density of Work Piece = (Proportion of Initial Volume*Specific Cutting Energy in Machining*Initial Work Piece Weight^(1-Constant For Tool Type(b)))/(Machining Time For Maximum Power*Constant For Tool Type(a))
Length of Workpiece given Machining time for maximum power
Go Length of Workpiece = (Machining Time For Maximum Power*Power Available For Machining)/(Specific Cutting Energy in Machining*pi*Diameter of Workpiece*Depth of Cut)
Constant for machine type b given Power available for Machining
Go Constant For Tool Type(b) = (ln(Power Available For Machining/Constant For Tool Type(a)))/(ln(Initial Work Piece Weight))
Initial weight of workpiece given Power available for Machining
Go Initial Work Piece Weight = (Power Available For Machining/Constant For Tool Type(a))^(1/Constant For Tool Type(b))
Power available for Machining given Initial weight of workpiece
Go Power Available For Machining = Constant For Tool Type(a)*(Initial Work Piece Weight)^Constant For Tool Type(b)
Constant for machine type given Power available for Machining
Go Constant For Tool Type(a) = Power Available For Machining/(Initial Work Piece Weight)^Constant For Tool Type(b)
Loading and Unloading time given initial weight of workpiece
Go Loading And Unloading Time = Constant For Tool Type(c)+(Constant For Tool Type(d)*Initial Work Piece Weight)
Initial weight of workpiece given Loading and Unloading time
Go Initial Work Piece Weight = (Loading And Unloading Time-Constant For Tool Type(c))/Constant For Tool Type(d)
Initial weight of workpiece given Cost of Machine tool
Go Initial Work Piece Weight = (Cost of A Tool/Constant For Tool Type(e))^(1/Constant for Tool Type(f))
Surface area of Workpiece given Surface Generation rate
Go Surface Area of Workpiece = (Machining Time for Minimum Cost*Surface Generation Rate)
Initial weight of workpiece given Machining time under Max power for free machining
Go Initial Work Piece Weight = (Machining Time For Maximum Power/49.9)^(1/0.47)
Initial weight of workpiece given Length-to-diameter Ratio
Go Initial Work Piece Weight = (1.26/Length to Diameter Ratio)^(1/0.29)
Length-to-diameter Ratio in terms Initial weight of workpiece
Go Length to Diameter Ratio = 1.26/(Initial Work Piece Weight^0.29)

Surface area of Workpiece given Surface Generation rate Formula

Surface Area of Workpiece = (Machining Time for Minimum Cost*Surface Generation Rate)
Am = (tmc*Rsg)

What is the importance of metal cutting process?

One of the major objectives of metal cutting theory is the determination of machining forces, chip geometry, tool life, energy consumption and surface finish from a knowledge of the physical properties of the workpiece and tool material and the cutting conditions alone.

How to Calculate Surface area of Workpiece given Surface Generation rate?

Surface area of Workpiece given Surface Generation rate calculator uses Surface Area of Workpiece = (Machining Time for Minimum Cost*Surface Generation Rate) to calculate the Surface Area of Workpiece, The Surface area of Workpiece given Surface Generation rate is defined as the total surface/lateral surface area of the workpiece. Surface Area of Workpiece is denoted by Am symbol.

How to calculate Surface area of Workpiece given Surface Generation rate using this online calculator? To use this online calculator for Surface area of Workpiece given Surface Generation rate, enter Machining Time for Minimum Cost (tmc) & Surface Generation Rate (Rsg) and hit the calculate button. Here is how the Surface area of Workpiece given Surface Generation rate calculation can be explained with given input values -> 5.8E+10 = (53.13*0.00108333).

FAQ

What is Surface area of Workpiece given Surface Generation rate?
The Surface area of Workpiece given Surface Generation rate is defined as the total surface/lateral surface area of the workpiece and is represented as Am = (tmc*Rsg) or Surface Area of Workpiece = (Machining Time for Minimum Cost*Surface Generation Rate). Machining Time for Minimum Cost is the time for processing when the workpiece is machined to obtain the minimum cost of Machining & Surface Generation Rate is defined as the constant for every material of the workpiece.
How to calculate Surface area of Workpiece given Surface Generation rate?
The Surface area of Workpiece given Surface Generation rate is defined as the total surface/lateral surface area of the workpiece is calculated using Surface Area of Workpiece = (Machining Time for Minimum Cost*Surface Generation Rate). To calculate Surface area of Workpiece given Surface Generation rate, you need Machining Time for Minimum Cost (tmc) & Surface Generation Rate (Rsg). With our tool, you need to enter the respective value for Machining Time for Minimum Cost & Surface Generation Rate and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!