Total Production Cost for given Batch Size Solution

STEP 0: Pre-Calculation Summary
Formula Used
Total Production Cost = Batch Size*Production Cost of Each Component
TPC = Nb*Cpr
This formula uses 3 Variables
Variables Used
Total Production Cost - Total Production Cost is the total amount that it takes to produce a batch of components from scratch.
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
Production Cost of Each Component - Production Cost of Each Component is the total amount that it takes to produce a single component from scratch.
STEP 1: Convert Input(s) to Base Unit
Batch Size: 2 --> No Conversion Required
Production Cost of Each Component: 15000 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
TPC = Nb*Cpr --> 2*15000
Evaluating ... ...
TPC = 30000
STEP 3: Convert Result to Output's Unit
30000 --> No Conversion Required
FINAL ANSWER
30000 <-- Total Production Cost
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Kumar Siddhant
Indian Institute of Information Technology, Design and Manufacturing (IIITDM), Jabalpur
Kumar Siddhant has created this Calculator and 400+ more calculators!
Verifier Image
Verified by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has verified this Calculator and 400+ more calculators!

21 Total Production Cost Calculators

Machining Time for Each Product using Total Production Cost
​ Go Machining Time = (Total Production Cost For Production Method-Cost of A Tool*Batch Size*Setup Time-Number of Tools Used*(Cost of A Tool*Time to Change One Tool+Cost of A Tool))/(Cost of A Tool*Batch Size)
Setup Time for Each Product given Total Production Cost
​ Go Setup Time = (Total Production Cost-Cost of A Tool*Batch Size*Machining Time-Number of Tools Used*(Cost of A Tool*Time to Change One Tool+Cost of A Tool))/(Cost of A Tool*Batch Size)
Tool Changing Time for Each Tool given Total Production Cost
​ Go Time to Change One Tool = (Total Production Cost-Batch Size*Cost of A Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of A Tool)/(Cost of A Tool*Number of Tools Used)
Non-Productive Cost of Each Component given Total Production Cost
​ Go Non Productive Cost of Each Component = Total Production Cost-(Batch Size*Cost of A Tool*Machining Time+Number of Tools Used*((Cost of A Tool*Time to Change One Tool)+Cost of A Tool))
Machining and Operating Rate given Total Production Cost
​ Go Machining and Operating Rate = (Total Production Cost-(Number of Tools Used*Cost of A Tool))/(Batch Size*(Setup Time+Machining Time)+(Number of Tools Used*Tool Changing Time))
Tool Changing Cost of Each Tool using Total Production Cost
​ Go Cost of changing each Tool = (Total Production Cost-Batch Size*Cost of A Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of A Tool)/(Number of Tools Used)
Total Production Cost
​ Go Total Production Cost = Batch Size*(Cost of A Tool*(Setup Time+Machining Time)+(Number of Tools Used)*((Cost of A Tool*Time to Change One Tool)+Cost of A Tool))
Number of Tools used given Total Production Cost
​ Go Number of Tools Used = (Total Production Cost-Batch Size*Cost of A Tool*(Setup Time+Machining Time))/(Cost of A Tool*Time to Change One Tool+Cost of A Tool)
Total Tool Changing Time given Total Production Cost
​ Go Total Tool Changing Time = (Total Production Cost-(Total Cost of Tools Used+Total Machining And Operating Cost+Total Non-Productive Cost))/(Number of Tools Used*Cost of A Tool)
Total Tool Changing Cost using Total Production Cost
​ Go Total Tool Changing Cost = Total Production Cost-Batch Size*Cost of A Tool*(Setup Time+Machining Time)-Number of Tools Used*Cost of A Tool
Total Non-Productive Time using Total Production Cost
​ Go Non Productive Time = (Total Production Cost for Setup Time-(Total Machining And Operating Cost+Total Tool Changing Cost+Total Cost of Tools Used))/(Cost of A Tool)
Total Machining Time using Total Production Cost
​ Go Total Machining Time = (Total Production Cost-(Total Non-Productive Cost+Total Tool Changing Cost+Total Cost of Tools Used))/(Cost of A Tool)
Total Non-Productive Cost given Total Production Cost
​ Go Total Non Productive Cost = Total Production Cost-(Total Machining And Operating Cost+Total Tool Changing Cost+Total Cost of Tools Used)
Total Cost of Tools given Total Production Cost
​ Go Total Cost of Tools Used = Total Production Cost-(Total Machining And Operating Cost+Total Tool Changing Cost+Total Non Productive Cost)
Total Tool-Changing Cost
​ Go Total Tool Changing Cost = Total Tool Changing Time*Number of Tools Used
Time for Changing one Tool given Total Tool Changing Time
​ Go Time to Change One Tool = Total Tool Changing Time/Number of Tools Used
Total Tool Changing Time
​ Go Total Tool Changing Time = Number of Tools Used*Time to Change One Tool
Total Production Cost for given Batch Size
​ Go Total Production Cost = Batch Size*Production Cost of Each Component
Batch Size given Total Production Cost
​ Go Batch Size = Total Production Cost/Production Cost of Each Component
Cost of Tool given Total Cost of Tools
​ Go Cost of A Tool = Total Cost of Tools Used/Number of Tools Used
Total Cost of Tools Used
​ Go Total Cost of Tools Used = Number of Tools Used*Cost of A Tool

Total Production Cost for given Batch Size Formula

Total Production Cost = Batch Size*Production Cost of Each Component
TPC = Nb*Cpr

Average Production Cost of each component

The average Production Cost of each component is usually determined by taking an average over a defined batch of products. The reason for this is the extended costs such as the cost of tools and operating costs etc. This makes the Average Production Cost becomes quite higher for a single product than when measured over batch size.

How to Calculate Total Production Cost for given Batch Size?

Total Production Cost for given Batch Size calculator uses Total Production Cost = Batch Size*Production Cost of Each Component to calculate the Total Production Cost, The Total Production Cost for given Batch Size is defined as the total cost of producing a batch of components from scratch including all necessary operations and processes. Total Production Cost is denoted by TPC symbol.

How to calculate Total Production Cost for given Batch Size using this online calculator? To use this online calculator for Total Production Cost for given Batch Size, enter Batch Size (Nb) & Production Cost of Each Component (Cpr) and hit the calculate button. Here is how the Total Production Cost for given Batch Size calculation can be explained with given input values -> 30000 = 2*15000.

FAQ

What is Total Production Cost for given Batch Size?
The Total Production Cost for given Batch Size is defined as the total cost of producing a batch of components from scratch including all necessary operations and processes and is represented as TPC = Nb*Cpr or Total Production Cost = Batch Size*Production Cost of Each Component. Batch Size is the count of similar kinds of products to be manufactured & Production Cost of Each Component is the total amount that it takes to produce a single component from scratch.
How to calculate Total Production Cost for given Batch Size?
The Total Production Cost for given Batch Size is defined as the total cost of producing a batch of components from scratch including all necessary operations and processes is calculated using Total Production Cost = Batch Size*Production Cost of Each Component. To calculate Total Production Cost for given Batch Size, you need Batch Size (Nb) & Production Cost of Each Component (Cpr). With our tool, you need to enter the respective value for Batch Size & Production Cost of Each Component and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Total Production Cost?
In this formula, Total Production Cost uses Batch Size & Production Cost of Each Component. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Total Production Cost = Batch Size*(Cost of A Tool*(Setup Time+Machining Time)+(Number of Tools Used)*((Cost of A Tool*Time to Change One Tool)+Cost of A Tool))