Digested Sludge using Sludge Feed Rate for Dewatering Facility Solution

STEP 0: Pre-Calculation Summary
Formula Used
Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Ds = (Sv*T)
This formula uses 3 Variables
Variables Used
Digested Sludge - (Measured in Cubic Meter per Second) - Digested Sludge is the product of either aerobic or anaerobic digestion and is a well-stabilized material capable of being dewatered.
Volumetric Sludge Feed Rate - (Measured in Cubic Meter per Second) - Volumetric Sludge Feed Rate relates the daily wastewater load and the available sludge mass.
Operation Time - (Measured in Second) - Operation Time is the time for which the dewatering is going on.
STEP 1: Convert Input(s) to Base Unit
Volumetric Sludge Feed Rate: 2.4 Cubic Meter per Second --> 2.4 Cubic Meter per Second No Conversion Required
Operation Time: 10 Second --> 10 Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Ds = (Sv*T) --> (2.4*10)
Evaluating ... ...
Ds = 24
STEP 3: Convert Result to Output's Unit
24 Cubic Meter per Second --> No Conversion Required
FINAL ANSWER
24 Cubic Meter per Second <-- Digested Sludge
(Calculation completed in 00.004 seconds)

Credits

Creator Image
Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verifier Image
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

9 Sludge Volume and Feed Rate Calculators

Percent Reduction in Sludge Volume
​ Go Volume Reduction = (Sludge Volume in-Sludge Volume Out)/Sludge Volume in
Solids Recovery given Dewatered Sludge Discharge Rate
​ Go Solid Recovery in Decimal = (Cake Discharge Rate/Sludge Feed Rate)
Dewatered Sludge or Cake Discharge Rate
​ Go Cake Discharge Rate = (Sludge Feed Rate*Solid Recovery in Decimal)
Sludge Feed Rate using Dewatered Sludge Discharge Rate
​ Go Sludge Feed Rate = Cake Discharge Rate/Solid Recovery in Decimal
Digested Sludge using Sludge Feed Rate for Dewatering Facility
​ Go Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Operation Time given Sludge Feed Rate for Dewatering Facility
​ Go Operation Time = (Digested Sludge/Volumetric Sludge Feed Rate)
Sludge Feed Rate for Dewatering Facility
​ Go Volumetric Sludge Feed Rate = (Digested Sludge/Operation Time)
Sludge Volume-in given Percent Reduction in Sludge Volume
​ Go Sludge Volume in = (Sludge Volume Out/(1-Volume Reduction))
Sludge Volume-out given Percent Reduction in Sludge Volume
​ Go Sludge Volume Out = Sludge Volume in*(1-Volume Reduction)

Digested Sludge using Sludge Feed Rate for Dewatering Facility Formula

Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time)
Ds = (Sv*T)

What is digested sludge ?

Digested sludge is the product of either aerobic or anaerobic digestion and is a well-stabilized material capable of being dewatered on open drying beds without severe odor problems.

How to Calculate Digested Sludge using Sludge Feed Rate for Dewatering Facility?

Digested Sludge using Sludge Feed Rate for Dewatering Facility calculator uses Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time) to calculate the Digested Sludge, The Digested Sludge using Sludge Feed Rate for Dewatering Facility is defined as the product of either aerobic or anaerobic digestion.It is calculated when we have operating time and sludge feed rate. Digested Sludge is denoted by Ds symbol.

How to calculate Digested Sludge using Sludge Feed Rate for Dewatering Facility using this online calculator? To use this online calculator for Digested Sludge using Sludge Feed Rate for Dewatering Facility, enter Volumetric Sludge Feed Rate (Sv) & Operation Time (T) and hit the calculate button. Here is how the Digested Sludge using Sludge Feed Rate for Dewatering Facility calculation can be explained with given input values -> 200 = (2.4*10).

FAQ

What is Digested Sludge using Sludge Feed Rate for Dewatering Facility?
The Digested Sludge using Sludge Feed Rate for Dewatering Facility is defined as the product of either aerobic or anaerobic digestion.It is calculated when we have operating time and sludge feed rate and is represented as Ds = (Sv*T) or Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time). Volumetric Sludge Feed Rate relates the daily wastewater load and the available sludge mass & Operation Time is the time for which the dewatering is going on.
How to calculate Digested Sludge using Sludge Feed Rate for Dewatering Facility?
The Digested Sludge using Sludge Feed Rate for Dewatering Facility is defined as the product of either aerobic or anaerobic digestion.It is calculated when we have operating time and sludge feed rate is calculated using Digested Sludge = (Volumetric Sludge Feed Rate*Operation Time). To calculate Digested Sludge using Sludge Feed Rate for Dewatering Facility, you need Volumetric Sludge Feed Rate (Sv) & Operation Time (T). With our tool, you need to enter the respective value for Volumetric Sludge Feed Rate & Operation Time and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know